La. Admin. Code tit. 33 § V-30169

Current through Register Vol. 50, No. 9, September 20, 2024
Section V-30169 - New Pipe [49 CFR 195.112]
A. Any new pipe installed in a pipeline system must comply with the following. [ 49 CFR 195.112]
1. The pipe must be made of steel of the carbon, low alloy-high strength, or alloy type that is able to withstand the internal pressures and external loads and pressures anticipated for the pipeline system. [ 49 CFR 195.112(a)]
2. The pipe must be made in accordance with a written pipe specification that sets forth the chemical requirements for the pipe steel and mechanical tests for the pipe to provide pipe suitable for the use intended. [ 49 CFR 195.112(b)]
3. Each length of pipe with a nominal outside diameter of 4 1/2 in. (114.3 mm) or more must be marked on the pipe or pipe coating with the specification to which it was made, the specified minimum yield strength or grade, and the pipe size. The marking must be applied in a manner that does not damage the pipe or pipe coating and must remain visible until the pipe is installed. [ 49 CFR 195.112(c)]

La. Admin. Code tit. 33, § V-30169

Promulgated by the Department of Natural Resources, Office of Conservation, Pipeline Division, LR 15:629 (August 1989), amended LR 21:817 (August 1995), LR 27:1525 (September 2001), LR 29:2815 (December 2003).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:753.