Current through Register Vol. 50, No. 11, November 20, 2024
Section CV-1733 - TestingA. Steps Used for Various Testing Processes: 1. acceptance testing of cables;2. maintenance testing of generators;3. insulation tests using megohmmeter.B. Utilizing the Results of Testing Procedures: 1. special requirements for high voltage testing;2. describe potential safety hazards;3. characteristics and properties of high voltage cable and insulators;4. appropriate tests methods, voltages and equipment.La. Admin. Code tit. 28, § CV-1733
Promulgated by the Department of Education, Board of Elementary and Secondary Education, Trade and Industrial Education, LR 32:580 (April 2006).AUTHORITY NOTE: Promulgated in accordance with R.S. 17:6(A)(10) and R.S. 17:10.