Current through Register Vol. 43, No. 50, December 12, 2024
Section 28-29-6 - Permits and engineering plans(a) Application for permits. Every person desiring to obtain a permit shall file an application for a permit for the proposed solid waste disposal area or processing facility with the department at least thirty (30) days before the date the person wishes to start construction, alteration, or operation of the disposal area or processing facility. The application shall be on forms furnished by the department. (b) Design plans and engineering reports. (1) Design and closure plans and engineering reports required under these regulations shall bear the seal and signature of a professional engineer licensed to practice in Kansas. (2) Waiver. Plans, designs, and relevant data for the construction of the following solid waste disposal areas and processing facilities, need not be prepared by a professional engineer provided that a review of these plans is conducted by a professional engineer licensed to practice in Kansas: (A) Solid waste processing facilities when the equipment is originally manufactured for those purposes and installation is supervised by the vendor, or when the equipment requires only fencing, buildings, and connection to utility lines to be operational; (B) Construction and demolition landfills; and (C) Solid waste disposal areas considered by the department to be located in secure geological formations, which are a part of a solid waste management system established pursuant to K.S.A. 65-3401 et seq., and which are expected to receive less than one hundred (100) tons of solid waste annually. (c) Permit considerations. Any permit issued by the secretary shall, where appropriate, be reviewed with respect to all responsibilities within the department. (d) Transfer of permits. Before any assignment, sale, conveyance, or transfer of all or any part of the property upon which a solid waste processing facility, or solid waste disposal area is or has been located, and before any change in the responsibility of operating a processing facility or disposal area is made, the permittee shall notify the department, in writing, of the intent to transfer title or operating responsibility, at least thirty (30) days in advance of the date of transfer. The person to whom the transfer is to be made shall not operate the solid waste processing facility or disposal area until the secretary issues a permit to that person. The person to whom the transfer is to be made shall submit the following: (1) A permit application and plans, maps, and data as required by subsection (a) of this regulation; (2) Plans satisfactory to the department for correcting any existing permit violations; and (3) Substantiation in writing that the applicant has copies of all approved maps, plans, and specifications relating to the solid waste processing facility or disposal area. (e) Conformity with official plan. Permits shall not be issued by the secretary until the applicant has secured, from the board of county commissioners or from the mayor of an incorporated city having an official plan, certification that the proposed facility is consistent with the official plan. This approval shall not be required when the official plan does not provide for management of the solid waste(s) to be processed or disposed. (f) Reopening closed sites or facilities. Any person proposing to reopen, excavate, disrupt, or remove any solid waste from any solid waste disposal area where operations have been terminated shall secure a new permit as specified in paragraph (a) of this regulation. Applications for a permit shall include, where applicable, an operational plan stating the area involved, lines and grades defining limits of excavation, estimated number of cubic yards of material to be excavated, location where excavated solid waste is to be deposited, the estimated time required for excavation, and a plan for restoring the site. (g) Emergency provisions. In emergency situations involving solid waste which requires storage, transportation, or disposal on a one-time basis or other special cases where strict adherence to these regulations would result in undue hardships or unnecessary delays, the department can prescribe on a case-by-case basis, the procedures and conditions necessary for the safe and effective management of the wastes. The generator shall not take action in these cases except as immediately necessary for the protection of human health or the environment, until the action is approved by the department. Kan. Admin. Regs. § 28-29-6
Authorized by K.S.A. 1981 Supp. 65-3406; implementing K.S.A. 1981 Supp. 65-3406, 65-3407; effective, E-79-22, Sept. 1, 1978; effective May 1, 1979; amended, E-82-8, April 10, 1981; amended May 1, 1982.