Current through Register Vol. 43, No. 49, December 5, 2024
Section 28-19-723 - Existing municipal solid waste landfills; initial and periodic reporting(a) The owner or operator of an existing MSW landfill that meets the criteria of K.A.R. 28-19-722(a) shall prepare and submit to the department an initial design capacity report within 90 days of the effective date of this regulation. The report shall be prepared in accordance with the requirements of 40 CFR §60.757(a)(2), as in effect on July 1, 1996, which is hereby adopted by reference. (b) The owner or operator of an existing MSW landfill that meets the criteria of K.A.R. 28-19-722(a) shall prepare and submit to the department amended design capacity reports in accordance with the requirements of 40 CFR §60.757(a)(3), as in effect on July 1, 1996, which is hereby adopted by reference. (c) In meeting the requirements of this regulation, the owner or operator may calculate design capacity as required in subsections (a) and (b) of this regulation in either megagrams or cubic meters for comparison with the corresponding exemption values. Any density conversions and any assumptions made shall be documented and submitted with the initial design capacity report. (d) If the landfill is permanently closed, a closure notification shall be submitted to the department as provided for in CFR §60.75(d), as adopted by K.A.R. 28-19-726. Kan. Admin. Regs. § 28-19-723
Authorized by K.S.A. 1996 Supp. 65-3005; implementing K.S.A. 1996 Supp. 65-3008; effective Nov. 14, 1997.