Current through December 12, 2024
Section 905 IAC 1-47-3 - Proof of compliance criteriaAuthority: IC 7.1-2-3-7
Affected: IC 7.1-3-20-16
Sec. 3.
Proof of compliance with this rule must consist of the following documentation, which is required at the time the permit application is filed with the commission:
(1) A detailed map showing:(A) definite boundaries of the entire municipal riverfront development project; and(B) the location of the proposed permit within the project.(2) A copy of the local ordinance or resolution of the local governing body authorizing the municipal riverfront development project.(3) Detailed information concerning the expenditures of state and city funds on the municipal riverfront development project.(4) A listing of the types of events being held at the proposed permit premises pursuant to section 2(3) of this rule; and(5) Information concerning historical characteristics of the permit premises, including, but not limited to, the age and significance within the municipality.Alcohol and Tobacco Commission; 905 IAC 1-47-3; filed Aug 10, 2004, 3:30 p.m.: 27 IR 4021; readopted filed Nov 22, 2010, 2:11 p.m.: 20101222-IR-905100555RFAReadopted filed 7/29/2016, 1:57 p.m.: 20160824-IR-905160153RFAReadopted filed 8/18/2022, 9:08 a.m.: 20220914-IR-905220224RFA