Current through December 25, 2024
Section 675 IAC 15-1.5-2 - Application processAuthority: IC 22-13-2-2; IC 22-13-2-13; IC 22-13-4-2; IC 22-15-4-3
Affected: IC 22-12; IC 22-13; IC 22-15
Sec. 2.
(a) A person that wishes to become a third party inspection agency shall submit an application to the office of the state building commissioner.(b) An application shall contain the following: (2) The complete mailing address, including city, state, and zip code.(3) The physical address if mailing address is different.(4) The telephone number.(5) The facsimile number.(6) An electronic mail (e-mail) address. (7) An organizational chart of showing the names of managerial and technical personnel responsible for in-plant inspections, including any person who is retained by contractual agreement. (8) A document certifying that the third party inspection agency will comply with all applicable rules of the commission and the Indiana Code.(9) A resume for each person named on the organizational chart, including contract employees. The resume shall include the following: (A) The name of the person.(B) Academic and professional qualifications. (C) Experience in related areas and specific duties with the company.(D) Other states where the person is registered.(E) Certifications obtained and expiration dates. (F) Any other pertinent information. (10) A list of manufacturers and the number of years experience the third party inspection agency has in performing inspections.(11) For each manufacturer, a list of the third party inspection agency's current status. (c) The person shall pay the fees in accordance with 675 IAC 15-1.6.Fire Prevention and Building Safety Commission; 675 IAC 15-1.5-2; filed Aug 18, 2005, 4:30 p.m.: 29 IR 25; readopted filed Aug 4, 2011, 8:35 a.m.: 20110831-IR-675110254RFAReadopted filed 3/10/2017, 9:37 a.m.: 20170405-IR-675170005RFAReadopted filed 5/11/2023, 2:22 p.m.: 20230607-IR-675230104RFA