Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 25-31; IC 36-9-30
Sec. 8.3.
"Contingency action plan" means a written course of action to be followed for the method or methods of waste management or disposal if the facility is unable to operate or process solid waste for twenty-four (24) hours or longer.
329 IAC 11-2-8.3