Current through January 8, 2025
Section 327 IAC 3-2-5.5 - Nonsite-specific permitAuthority: IC 13-14-9; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-3-1; IC 13-18-4-1
Affected: IC 13-18-2
Sec. 5.5.
The commissioner may grant a nonsite-specific construction permit for the following category of discharger: Short term drainage/sediment control lagoons.
(1) Said lagoons are those constructed according to approved general plans and specifications; however, the specific site location changes with time.(2) Any request for issuance of such a nonsite-specific, ongoing construction permit shall be made by the applicant in conjunction with the application information presented in section 2 of this rule.(3) It shall be the responsibility of the recipient of such a permit to notify the commissioner each time of a change in location of the permitted facility.Water Pollution Control Board; 327 IAC 3-2-5.5; filed Jul 20, 2005, 1:00 p.m.: 28 IR 3552; readopted filed Jun 15, 2011, 11:15 a.m.: 20110713-IR-327110193BFAReadopted filed Jun 29, 2017, 9:34 a.m.: 20170726-IR-327170225BFAReadopted filed 5/12/2023, 1:07 p.m.: 20230607-IR-327230079BFAReadopted filed 10/18/2024, 1:57 p.m.: 20241113-IR-327230810RFA