327 Ind. Admin. Code 3-2-2.5

Current through December 25, 2024
Section 327 IAC 3-2-2.5 - Preventing conflict of interest

Authority: IC 13-13-5; IC 13-14-8; IC 13-14-9; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-2

Affected: IC 13-11-2; IC 13-15; IC 13-18

Sec. 2.5.

(a) An application, plan, or specification submitted for construction permit approval shall not be prepared or certified, partially or entirely, by the same person, firm, or organization that has permit review and issuance authority unless in accordance with subsection (b).
(b) An application, plan, or specification submitted for construction permit approval may be prepared or certified by noncontracted personnel of a unit if the following conditions are met:
(1) The unit has permit review and issuance authority.
(2) The unit owns and operates the receiving water pollution treatment/control facility where the wastewater from the proposed sanitary sewer project will be treated or controlled.

327 IAC 3-2-2.5

Water Pollution Control Board; 327 IAC 3-2-2.5; filed May 17, 1999, 12:11 p.m.: 22 IR 3083; errata filed May 20, 1999, 6:36 p.m.: 22 IR 3108; errata filed Dec 1, 2000, 5:25 p.m.: 24 IR 1033; readopted filed Apr 11, 2005, 2:45 p.m.: 28 IR 2470; readopted filed Jun 15, 2011, 11:15 a.m.: 20110713-IR-327110193BFA
Readopted filed Jun 29, 2017, 9:34 a.m.: 20170726-IR- 327170225BFA
Readopted filed 5/12/2023, 1:07 p.m.: 20230607-IR-327230079BFA
Readopted filed 10/18/2024, 1:57 p.m.: 20241113-IR-327230810RFA