170 Ind. Admin. Code 5-5-2.1

Current through January 8, 2025
Section 170 IAC 5-5-2.1 - Notice of inability to provide location information

Authority: IC 8-1-26-26

Affected: IC 8-1-26-18; IC 8-1-26-21

Sec. 2.1.

(a) The notice under IC 8-1-26-18(m) shall be an oral, a written, or an electronic contact with the person responsible for the excavation or demolition. The operator shall make a written record, contemporaneously at the time of the contact, containing at a minimum:
(1) the date, time, and manner of the communication;
(2) the name of all individuals that participated in the communication; and
(3) the new date by which the operator will provide the location information as required by IC 8-1-26-18.
(b) An operator of a pipeline facility that does not provide notice as specified in this section:
(1) fails to notify the person responsible for the excavation under IC 8-1-26-18(m); and
(2) if IC 8-1-26-18(j) otherwise applies, the operator is subject to the penalty specified in IC 8-1-26-18(j).

170 IAC 5-5-2.1

Indiana Utility Regulatory Commission; 170 IAC 5-5-2.1; filed 9/20/2023, 4:06 p.m.: 20231018-IR-170220359FRA
Errata filed 12/31/2024, 11:23 a.m.: 20250108-IR-170240642ACA