170 Ind. Admin. Code 4-5-11

Current through December 4, 2024
Section 170 IAC 4-5-11 - Submeter tests upon application to commission; fee

Authority: IC 8-1-1-3; IC 8-1-2-36.5

Affected: IC 8-1-2-36.5

Sec. 11.

Submeter Tests upon Application to the Commission. Upon application of any tenant to the commission, a test may be made of the tenant's submeter. The application for such test shall be accompanied by a fee of fifteen dollars. If the submeter tests within the accuracy standards for self-contained watt-hour meters as established by the ANSI C12.1-1982, the fee shall be turned over to the owner; if the test shows the meter to exceed the standards, then the fifteen dollars paid by the tenant shall be refunded to said tenant by the commission.

170 IAC 4-5-11

Indiana Utility Regulatory Commission; 170 IAC 4-5-11; filed Dec 13, 1984, 3:13 pm: 8 IR 487, eff Jan 1, 1985 [IC 4-22-2-5 suspends the effectiveness of a rule document for thirty 30 days after filing with the Secretary of State. LSA Document #84-57(F) was filed Dec 13, 1984.]; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFA
Readopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA