Section 170 IAC 4-3-2 - Scope and application of rules

Authority: IC 8-1-1-3; IC 8-1-2-10

Affected: IC 8-1-14-1; IC 8-3-1-1

Sec. 2.

These general principles are intended to promote coordination in the location, construction, operation, and maintenance of electric supply and signal lines, including crossing between such lines and steam and electric railway tracks, through the cooperation of the utilities concerned, so as to facilitate the safety and serviceability of all systems. Overhead and underground construction practice commenced after the date of promulgation of this section must comply with section 26(a) [sic.] of this rule.

170 IAC 4-3-2

Indiana Utility Regulatory Commission; No. 31889: Electric Utilities Rule 2; filed Jan 7, 1969, 11:55 a.m.: Rules and Regs. 1970, p. 251; filed Feb 28, 1986, 9:30 a.m.: 9 IR 1565; filed Oct 7, 1987, 12:30 p.m.: 11 IR 566; filed Oct 15, 1990, 3:28 p.m.: 14 IR 419; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFA;
Readopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA