Authority: IC 9-21-19-2
Affected: IC 8-23-20
Sec. 22.
On permits not covered by a bond, work performed that is incomplete, improperly performed, or otherwise does not follow the conditions or provisions of the permit shall be designated as "Does Not Comply". The department shall follow procedures for corrective action, beginning with the notice action stated in 105 IAC 7-2-4(2). Permit applications for existing approaches that are denied by the department shall be corrected by entering the same procedure in 105 IAC 7-2-4(2).
105 IAC 7-1-22
NOTE: Transferred from Department of Highways ( 120 IAC 2-1-21.5) to Indiana Department of Transportation ( 105 IAC 7-1-22) by P.L. 112-1989, SECTION 5, effective July 1, 1989.