Superload moves or moves on nonstandard vehicles or with nonstandard axle configurations may be authorized if allowable pavement and bridge stresses are not exceeded. These moves normally require additional time and fees (see Section 554.910 ) for analyses.
Ill. Admin. Code tit. 92, § 554.605
Amended at 36 Ill. Reg. 13254, effective August 1, 2012