A rail carrier shall install temporary STOP signs whenever the Commission authorizes the installation of automatic flashing light signals or automatic flashing light signals and gates at existing public highway-rail grade crossings equipped with crossbuck warning signs. The temporary STOP signs shall remain in place until the luminous flashing signal or crossing gate devices have been installed. The rail carrier is responsible for the cost of the installation and subsequent maintenance of any required temporary STOP signs.
Ill. Admin. Code tit. 92, § 1535.366
Added at 29 Ill. Reg. 20376, effective December 15, 2005