Unless otherwise authorized in the facility permit, prior to placing into service any structure constructed at a facility, the applicant shall obtain an operating authorization as a permit condition. In order to obtain such an operating authorization, the operator shall submit a report documenting that construction has been completed in accordance with the engineering design.
Ill. Admin. Code tit. 35, § 831.115