Current through Register Vol. 48, No. 49, December 6, 2024
Section 218.446 - Monitoring Program Plan for LeaksThe owner or operator of a petroleum refinery shall prepare a monitoring program plan which contains, at a minimum:
a) An identification of all refinery components and the period in which each will be monitored pursuant to Section 218.447 of this Part;b) The format for the monitoring log required by Section 218.448 of this Part;c) A description of the monitoring equipment to be used pursuant to Section 218.447 of this Part; andd) A description of the methods to be used to identify all pipeline valves, pressure relief valves in gaseous service and all leaking components such that they are obvious to both refinery personnel performing monitoring and Agency personnel performing inspections.Ill. Admin. Code tit. 35, § 218.446
Amended at 17 Ill. Reg. 16636, effective September 27, 1993