Current through Register Vol. 48, No. 44, November 1, 2024
Section 215.213 - Special Requirements for Compliance PlanFor sources subject to Sections 215.204 through 215.209, an approvable compliance plan shall include:
a) A complete description of each coating line which is subject to an emission limitation in Sections 215.204 through 215.209;b) Quantification of the allowable emissions from the coating plant determined under Section 215.207 where applicable; and,c) A description of the procedures and methods used to determine the emissions of volatile organic material including a method of inventory, record keeping and emission calculation or measurement which will be used to demonstrate compliance with the allowable plantwide emission limitation.Ill. Admin. Code tit. 35, § 215.213
Adopted at 3 Ill. Reg. 30, p. 124, effective July 28, 1979