Ill. Admin. Code tit. 35 § 201.635

Current through Register Vol. 48, No. 49, December 6, 2024
Section 201.635 - PBR Boiler Recordkeeping Requirements

The owner or operator of the PBR boiler must maintain records containing the following information, in addition to the records required by Section 201.530:

a) The maximum design heat input capacity of the boiler, in MMBtu/hr, with supporting documentation;
b) An inspection, maintenance, and repair log with dates and the nature of those activities for the boiler;
c) The quantity of each fuel used per month and per year;
d) The hours of operation, in hours/month and hours/year;
e) Emissions of PM, PM10, PM2.5, NOx, CO, and VOM, in tons/month and tons/year, with supporting calculations; and
f) SO2 emissions, in tons/month and tons/year, with supporting calculations if the boiler has the capability to burn refinery fuel gas, butane, or propane.

Ill. Admin. Code tit. 35, § 201.635

Added at 41 Ill. Reg. 4140, effective 3/24/2017