Current through September 2, 2024
Section 20.03.02.100 - DEVIATION FROM AN APPROVED RECLAMATION PLAN01.Unforeseen Events. If a mining operator finds that unforeseen events or unexpected conditions require immediate change from an approved plan, the operator may continue mining in accordance with the procedures dictated by the changed conditions, pending submission and approval of an amended plan, even though operations do not comply with the approved reclamation plan on file with the Department. This shall not excuse the operator from complying with the requirements of Sections 140 and 120 of these rules.02.Notification. The operator shall notify the director, in writing, within ten (10) days of the discovery of conditions that require deviation from the approved plan. A proposed amendment to the reclamation plan must be submitted by the operator within thirty (30) days of the discovery of those conditions.Idaho Admin. Code r. 20.03.02.100