Current through September 2, 2024
Section 16.02.13.200 - MAINTENANCE OF CERTIFICATIONIn order to maintain certification, drinking water laboratories must be able to demonstrate they continue to meet all of the following requirements.
01.Successful Completion of PT Samples. Each year, each laboratory must successfully complete a PT per analyte per method for which the laboratory is seeking to maintain certification.02.Use of Specified Methods. Each laboratory must be able to demonstrate it is using the methods specified in the drinking water regulations.03.Maintain Required Standard of Quality. The CO must be satisfied the laboratory is maintaining the required standard of quality for certification. This is based on the results of the PT testing, on-site evaluations, and any feedback from regulatory agencies.04.Notification of Major Changes. The laboratory must notify the CA in writing within thirty (30) days of major changes that could affect the accuracy and precision of testing. A major change includes the loss of a laboratory supervisor, equipment failure or breakdown, or change in location or ownership.Idaho Admin. Code r. 16.02.13.200