Haw. Code R. § tit. 13, subtit. 1, ch. 5, exh. 3

Current through November, 2024
Exhibit 3 - Management Plan Requirements

August 12, 2011

1 General description of the proposed use (e.g., forestry, fishpond, astronomy, aquaculture, agriculture).
2 Project location (e.g., island map, location map, site plan (drawn to scale)).
3 Natural resource assessment including descriptive information about the natural resources in the project vicinity such as biological, archaeological, cultural, geological, coastal, recreational, and scenic resources, where applicable. The presence of any threatened or endangered species shall be disclosed.
4 Natural hazard assessment including descriptive information of erosion, flooding, slope, tsunami, and volcanic hazards, where applicable.
5 A description of best management practices used during project construction and implementation (e.g., mitigation measures).
6 A description of the best management practices to be used during the lifetime of the project (e.g., mitigation measures).
7 A description of the conservation methods and applications to be used in the short term and long term (e.g., mitigation measures).
8 Description of existing uses and facilities, if any.
9 Description of proposed facilities and uses, including phases, if applicable.
10 Activity schedule

Project schedule including description of project sequencing from project construction to project completion and on-going maintenance plans, including a description and timing of natural resource monitoring and maintenance plans.

A description of the annual reporting requirements.

11 Any other information or data, as required by the department.

Haw. Code R. tit. 13, subtit. 1, ch. 5, exh. 3

September 6, 1994