Section 11-55-04 - Application for NPDES permit, notice of intent, or conditional "no exposure" exclusion
(a) Before discharging any pollutant, or beginning construction activities that disturb one or more acres of land or construction activities that disturb less than one acre of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb one acre or more of total land area, or substantially altering the quality of any discharges, or substantially increasing the quantity of any discharges, or for regulated small municipal separate storm sewer systems, unless the director waives NPDES permit coverage in accordance with 40 CFR § 122.32(d) or (e), a person shall submit a complete NPDES permit application (which shall include whole effluent toxicity testing data as specified in 40 CFR § 122.21(j) ( 5)), submit a complete notice of intent, except for the point source discharges from the application of pesticides, if not required (refer to Appendix M) or, for certain storm water discharges, meet all requirements for a conditional "no exposure" exclusion. Submittal of a notice of intent for coverage under a general permit shall comply with and be regulated by sections 11-55-34.08 through 11-55-34.10. Conditional "no exposure" exclusions shall comply with and be regulated by subsection (e). An NPDES permit application shall be submitted:
(1) At least one hundred eighty days before the discharge or construction begins or, for renewals, at least three hundred sixty days before the expiration date of the existing permit. The director may waive this three hundred sixty day requirement by issuing the permit with an effective date before the three hundred sixty days expire;
(2) In sufficient time prior to the beginning of the discharge of pollutants to ensure compliance with the requirements of new source performance standards under Section 306 of the Act, 33 U.S.C. § 1316, or with any applicable zoning or site requirements established under Section 208(b)(2)(C) of the Act, 33 U.S.C. § 1288(b)(2)(C), and any other applicable water quality standards and applicable effluent standards and limitations;
(3) For any storm water discharge associated with industrial activity from an existing facility that is owned or operated by a municipality with a population of less than 100,000 that is not authorized by a general or individual permit, other than an airport, power-plant, or uncontrolled sanitary landfill;
(4) For any discharge from an existing regulated small municipal separate storm sewer system which is not qualified to obtain coverage under the general permit. The permit application shall be made under 40 CFR § 122.33 if the small municipal separate storm sewer system is designated under 40 CFR § 122.32(a)(1). A small municipal separate storm sewer system, including but not limited to systems operated by federal, state, and local governments, including state departments of transportation, is regulated when it is located in an urbanized area as determined by the latest decennial census by the Bureau of the Census. (If the small municipal separate storm sewer system is not located entirely within an urbanized area, only the portion that is within the urbanized area is regulated.) Small municipal separate storm sewer systems located outside of urbanized areas shall submit an NPDES permit application if the department determines that the system1s storm water discharge results in or has the potential to result in exceedances of water quality standards, including impairment of designated uses, or other significant water quality impacts, including habitat and biological impacts. The department shall evaluate the small municipal separate storm sewer system with the following elements, at a minimum: discharge to sensitive waters, high growth or growth potential, high population density, contiguity to an urbanized area, significant contributor of pollutants to State waters, and ineffective protection of water quality by other programs. The NPDES permit application shall be submitted within one hundred eighty days of notice from the department;
(5) For any discharge from a regulated concentrated animal feeding operation. The permit application shall be made under 40 CFR § 122.21;
(6) (Reserved); or
(7) At least one hundred eighty days before the construction activity as identified in 40 CFR § 122.26(b)(l4)(x) or small construction activity as defined in 40 CFR § 122.26(b)(l5)(i) begins and is not qualified to obtain coverage under the general permit.
(b) Application for an individual permit shall be made by the owner or operator on an NPDES permit application provided by the director. The NPDES permit application shall be submitted with complete data, site information, plan description, specifications, drawings, and other detailed information. The information submitted shall comply with 40 CFR §§ 122.2l(f) through (1) and (r) to determine in what manner the new or existing treatment works or wastes outlet, including a facility described in 40 CFR §§ 122.23, 122.24, 122.25, 122.26, or 122.27, will be constructed or modified, operated, and controlled. When a facility or activity is owned by one person, but is operated by another person, it is the operator's duty to obtain a permit on behalf of the owner. The operator shall provide written evidence that the owner authorizes the operator to apply on behalf of the owner and that the owner agrees to comply with all permit conditions. Only one permit is required for a single facility or activity.
(c) The director may require the submission of additional information after an NPDES permit application has been submitted, and shall ensure that, if an NPDES permit application is incomplete or otherwise deficient, processing of the application shall not be completed until the owner or its duly authorized representative has supplied the missing information or otherwise corrected the deficiency.
(d) Every owner or operator applying for an individual permit or renewal of an individual permit shall pay a filing fee of $1,000. This filing fee shall be submitted with the NPDES permit application and shall not be refunded nor applied to any subsequent NPDES permit application following final action of denial of the NPDES permit application.
(1) When an NPDES permit application is submitted for an individual permit for a substantial alteration or addition to a treatment works or waste outlet and where an individual permit had previously been granted for the treatment works or waste outlet, the owner or operator shall pay a $1,000 filing fee which shall be submitted with the NPDES permit application;
(2) A new owner of a discharge facility covered by an individual permit shall submit a new NPDES permit application for a new individual permit unless the new owner submits a notice of automatic transfer that meets 40 CFR § 122.6l(b). The owner or operator shall pay a $500 filing fee which shall be submitted with the NPDES permit application or notice of automatic transfer that meets 40 CFR § 122.61(b);
(3) An NPDES individual permittee shall submit a new NPDES permit application for the transfer of discharge from one permanent location to another permanent location. The owner or operator shall pay the $1,000 filing fee which shall be submitted with the NPDES permit application; and
(4) Fees shall be made payable to the 'State of Hawaii" in the form of a pre-printed check, cashier's check, money order, or as otherwise specified by the director.
(e) Discharges composed entirely of storm water are not storm water discharges associated with industrial activity, and do not require an individual permit or general permit coverage, if there is "no exposure" of industrial materials and activities to rain, snow, snowmelt or runoff or any combination of the above, and the owner or operator of the discharge:
(1) Meets the conditions of 40 CFR §§ 122.26(g)(1) through 122.26(g)(4), except 40 CFR § 122.26(g)(1)(iii);
(2) Submits a properly completed and signed "no exposure" certification on a form provided by the director;
(3) Submits a properly completed and signed "no exposure" certification form at least once every five years, or earlier if specified by the director or upon the change of ownership, operator, or location; and
(4) Provides any additional information requested by the director after a "no exposure" certification has been submitted. The conditional "no exposure" exclusion is effective upon receipt by the department of the certification, assuming all other conditions are met, and the director may specify the term of a conditional "no exposure" exclusion, or any renewal, for any period not to exceed five years. There is no filing fee for submittal of a "no exposure" certification.
(f) (Reserved)
(g) Industrial activities, except construction activities under 40 CFR § 122.26(b) (14) (x) and 40 CFR §122.26(b) (15), which provide calculations and certify that they do not discharge storm water to State waters are not required to obtain an individual permit or general permit coverage.
(h) (Reserved)

Haw. Code R. § 11-55-04

[Eff 11/27/81; am and comp 10/29/92; am 09/23/96; am and comp 09/22/97; am and comp 01/06/01; am and comp 11/07/02; am and comp 08/01/05; am and comp 10/22/07; am and comp 6/25/09; am and comp 10/21/12; am and comp 12/6/13; am and comp 11/15/2014 ] (Auth: HRS §§ 342D-4, 342D-5, 342D-6; 33 U.S.C. §§1251, 1342, 1370 ) (Imp: HRS §§ 6E-42(a), 342D-2, 342D-4, 342D-5, 342D-6, 342D-13; 33 U.S.C. §§1251, 1288(b)(2)(C), 1316, 1342, 1370, 1251-1387; 40 CFR Parts 122; 123; 124, Subparts A and D; 125; §§122.21, 122.23, 122.24, 122.25, 122.26, 122.27, 122.61, 123.25(a), 124.3)
Am and Comp 7/13/2018
Am and comp 2/9/2019
Eff OCT 22 2021
Comp 1/15/2022