Fla. Admin. Code R. 62-600.670

Current through Reg. 50, No. 244; December 17, 2024
Section 62-600.670 - Ground Water Monitoring
(1) Wastewater treatment facilities which are designed so that some or all of the reclaimed water or effluent may enter ground waters shall conduct ground water monitoring in accordance with Chapter 62-520, F.A.C., and this chapter.
(2) Where reclaimed water is applied to multiple sites permitted under Part III of Chapter 62-610, F.A.C., one or more of the sites (representative of each site's hydrogeological characteristics, soil characteristics, vegetative cover, and reclaimed water application method, etc.) shall be selected by the applicant and approved in writing by the Department as the model site(s) for monitoring the ground water.
(3) The minimum schedule for ground water monitoring is specified in Figure 2 below:

Figure 2. Minimum Sampling Frequency for Ground Water Monitoring

Parameter

Reuse and Land

Application Systems -

New facilities1 with a design capacity < 100, 000 gpd

Reuse and Land

Application Systems - New facilities1 with a design capacity >= 100, 000 gpd and existing facilities

Injection to Aquifer Storage and Recovery (ASR) Systems

Injection to Class F-I, G-I, or G-II Ground Water, except ASR Systems

Injection to Ground Water, except to Class F-I, G-I, G-II, or ASR Systems

Water Level

Semiannually

Quarterly

Quarterly

Monthly

Monthly

Total

Nitrate Nitrogen

(as N)

Semiannually

Quarterly

Monthly

Total Dissolved Solids

Semiannually

Quarterly

Monthly

Arsenic,

Total Recoverable

Semiannually

Quarterly

Cadmium,

Total Recoverable

Semiannually

Quarterly

Chloride (as Cl)

Semiannually

Quarterly

Chromium,

Total Recoverable

Semiannually

Quarterly

Lead, Total Recoverable

Semiannually

Quarterly

Fecal Coliform

Semiannually

Quarterly

Quarterly

pH

Semiannually

Quarterly

Total Sulfate

Semiannually

Quarterly

Total Kjeldahl Nitrogen (as N)

Monthly

Monthly

Total Phosphorus

(as P)

Monthly

Turbidity

Semiannually

Quarterly

Quarterly

Monthly

Monthly

Specific Conductance

Quarterly

Ground Water Standards2

Quarterly

Quarterly

1In accordance with subsection 62-520.600(10), F.A.C., new facilities are facilities which have filed a complete permit application after July 1, 1994.

2As specified in rules 62-520.420, 62-520.460 and 62-550.830, F.A.C.

(4) Grab samples shall be used to test for all ground water parameters.
(5) Monitoring wells shall be purged prior to sampling to obtain a representative sample.

Fla. Admin. Code Ann. R. 62-600.670

Rulemaking Authority 403.061(7) FS. Law Implemented 403.061(13) FS.

Adopted by Florida Register Volume 42, Number 016, January 26, 2016 effective 2/8/2016, Amended by Florida Register Volume 47, Number 178, September 14, 2021 effective 9/27/2021.

New 2-8-16, Amended 9-27-21.