RM = [(C - L)/L]*100 where;
"RM" - Is defined as the utility's percent planned reserve margin;
"C" - Is defined as the aggregate sum of the rated dependable peak-hour capabilities of the resources that are expected to be available at the time of the utility's annual peak; and
"L" - Is defined as the expected firm peak load of the system for which reserves are required.
The following shall be utilized as the operating reserve standard for Peninsular Florida's utilities: operating reserves shall be maintained by the combined Peninsular Florida system at a value equal to or greater than the loss of generation that would result from the most severe single generating unit contingency. The operating reserves shall be allocated among the utilities in proportion to each control area's peak hour net energy for load for the preceding year, and the summer gross Florida Reliability Coordinating Council (FRCC) capability of its largest unit or ownership share of a joint unit, whichever is greater. Fifty percent shall be allocated on the basis of peak hour net energy for load and fifty percent on the basis of the summer gross FRCC capability of the largest unit. Operating reserves shall be fully available within fifteen minutes. At least 25% of the operating reserves shall be in the form of spinning reserves which are automatically responsive to a frequency deviation from normal.
Fla. Admin. Code Ann. R. 25-6.035
Rulemaking Authority 366.05(1) FS. Law Implemented 366.03, 366.04(2)(c), (5), 366.055 FS.
New 7-29-69, Formerly 25-6.35, Amended 9-5-96, 5-29-01.