The Department shall adjust the fees in this section for inflation annually, using the Urban Consumer Price Index published by the United States Bureau of Labor Statistics. To perform this adjustment, the Department shall increase each fee by the percentage, if any, by which the Urban Consumer Price Index for June of the calendar year exceeds the Urban Consumer Price Index for June of the previous year. Each inflation adjustment shall be posted to the Department's website.
An applicant shall pay supplemental and revision review fees as follows:
An applicant for Department approval of a soil erosion and sediment control plan shall pay the fees in Table 1 for Department services at the indicated time, as applicable:
Table 1. Fees for Soil Erosion and Sediment Control Plan Review | ||||
Payment Type | Payment Requirement | Fees by Land Disturbance Type | ||
Residential | All Other | |||
[LESS THAN EQUAL TOO] 50 ft2 and < 500 ft2 | [LESS THAN EQUAL TOO] 50 ft2 and < 5,000 ft2 | [LESS THAN EQUAL TOO] 5,000 ft2 | ||
Initial | Due upon filing for building permit | $55.20 | $480.26 | $1,181.32 |
Final | Due before building | n/a | $0.17 per 100 ft2 | |
. Clearing and grading > 5,000 ft2 | permit is issued | |||
. Excavation base fee | n/a | $480.26 | ||
. Excavation > 66 yd3 | $0.11 per yd3 | |||
. Filling > 66 yd3 | $0.11 per yd3 | |||
Supplemental | Due before building permit is issued | $110.40 | $110.40 | $1,104.04 |
Revision | Due upon review | $55.20 | $55.20 | $552.02 |
An applicant for Department approval of a Stormwater Management Plan (SWMP) shall pay the fees in Table 2 for Department services at the indicated time, as applicable:
Table 2. Fees for Stormwater Management Plan Review | |||
Payment Type | Payment Requirement | Fees by Combined Area of Land Disturbance and Substantial Improvement Building Footprint | |
[LESS THAN EQUAL TOO] 5,000 ft2 and [GREATER THEN EQUAL TOO] 10,000 ft2 | > 10,000 ft2 | ||
Initial | Due upon filing for building permit | $3,643.32 | $6,734.62 |
Final | Due before building permit is issued | $1,656.06 | $2,649.69 |
Supplemental | Due before building permit is issued | $1,104.04 | $2,208.07 |
Revision | Due upon review | $552.02 | $1,104.04 |
An applicant for Department approval of a plan and any other person requesting the services in Table 3 shall pay the additional fees in Table 3 for Department services before issuance of a building permit, except:
An applicant shall be required to pay the fees in Table 3 for review of a Stormwater Pollution Prevention Plan (SWPPP) only if the site is regulated under the Construction General Permit issued by Region III of the United States Environmental Protection Agency.
Table 3. Additional Fees
Review or Inspection Type | Fees by Combined Area of Land Disturbance and Substantial Improvement Building Footprint | |
[GREATER THEN EQUAL TOO] 10,000 ft2 | > 10,000 ft2 | |
Soil characteristics inquiry | $165.61 | |
Geotechnical report review | $77.28 per hour | |
Pre-development review meeting | No charge for first hour $77.28 per additional hour | |
After-hours inspection fee | $55.20 per hour | |
Stormwater pollution plan review | $1,214.44 | |
Dewatering pollution reduction plan review | $1,214.44 | $2,318.48 |
Application for relief from extraordinarily difficult site conditions | $552.02 | $1,104.04 |
An applicant for Department approval of a SWMP for a project being conducted solely to install a Best Management Practice (BMP) or land cover for Department certification of a Stormwater Retention Credit (SRC) shall pay the fees in Table 4 for Department services at the indicated time, as applicable, except that:
same
project.
Table 4. Fees for Review of Stormwater Management Plan to Certify Stormwater Retention Credits
Payment Type | Payment Requirement | Fees by Combined Area of Land Disturbance and Substantial Improvement Building Footprint | |
[GREATER THEN EQUAL TOO] 10,000 ft2 | > 10,000 ft2 | ||
Initial | Due upon filing for building permit | $634.82 | $938.43 |
Final | Due before building permit is issued | $138.00 | $220.81 |
Supplemental | Due before building permit is issued | $552.02 | |
Revision | Due upon review | $276.01 |
A person who requires Departmental approval of an as-built SWMP for SRC certification for a BMP or land cover for which a plan review fee has not been paid to the Department shall pay each applicable fee for initial and final SWMP review in Table 4.
A person who requires the Department's review of a proposed or as-built SWMP solely for the purpose of applying for a storm water fee discount under this chapter shall not be required to pay a plan review fee to the Department for that project, except that a person who subsequently applies for SRC certification for the same project shall pay each applicable fee for initial and final plan review before the Department will consider the application for SRC certification.
An applicant for Department approval of a Green Area Ratio plan shall pay the fees in Table 5 for Department services at the indicated time:
Table 5. Fees for Review of Green Area Ratio Plan
Payment Type | Payment Requirement | Fees by Combined Area of Land Disturbance and Substantial Improvement Building Footprint | |
[GREATER THEN EQUAL TOO] 10,000 ft2 | > 10,000 ft2 | ||
Initial | Due upon filing for building permit | $1214.44 | $2,244.87 |
Final | Due before building permit is issued | $552.02 | $883.23 |
Supplemental | For reviews after first resubmission | $368.01 | $736.02 |
Revision | Due upon review | $184.05 | $368.01 |
The in-lieu fee shall be three dollars and eighty-four cents ($3.86) per year for each gallon of Off-Site Retention Volume (Offv). In accordance with the court-approved consent decree, including court-approved modifications, for reducing Combined Sewer Overflows (CSOs) in the District of Columbia:
The administrative late fee for an in-lieu fee payment shall be ten percent (10%) of the late payment.
A person shall pay the fees in Table 6 for the indicated resource before receipt of the printed resource:
Table 6. Fees for Printed Resources
Paper Copies of Documents | Cost |
District Standards and Specifications for Soil Erosion and Sediment Control | $55.20 |
District Stormwater Management Guidebook | $96.51 |
District Erosion and Sediment Control Standard Notes and Details (24 in x 36 in) | $27.60 |
District Erosion and Sediment Control Manual | $46.04 |
District Erosion and Sediment Control Field Handbook | $27.60 |
If a project consists entirely of single- and two-family affordable houses, is eligible for consideration under the practicable process described in § 518.14, or satisfies less than fifty percent (50%) of the SWRv on-site as described in §§ 520.4(a)(2) or 522.5(a)(2), then the applicant for Department approval of a SWMP shall pay the reduced fees in Table 7 for Department services at the indicated time, as applicable, except that:
Table 7. Reduced Fees for Stormwater Management Plan Review
Payment Type | Payment Requirement | Fees by Combined Area of Land Disturbance and Substantial Improvement Building Footprint | |
[LESS THAN EQUAL TOO] 5,000 ft2 and [GREATER THEN EQUAL TOO] 10,000 ft2 | > 10,000 ft2 | ||
Initial | Due upon filing for building permit | $2,732.49 | $5,050.97 |
Final | Due before building permit is issued | $1,242.04 | $1,987.27 |
Supplemental | Due before building permit is issued | $828.03 | $1,656.06 |
Revision | Due upon review | $414.02 | $828.03 |
If a person chooses to pay a fee in this chapter through an online payment platform, the Department shall increase the fee by 2.36%.
D.C. Mun. Regs. tit. 21, r. 21-501