Section 25-128-55a - Period of responsibility

The well drilling contractor shall be responsible for a period of one (1) year from the date of completion of work performed on the well to insure that the physical construction of the well meets the requirements of this code. The contractor shall not be responsible if work has been performed on the well by others, or if activities by others in the vicinity of the well have adversely affected the well.