2 Colo. Code Regs. § 407-4-6

Current through Register Vol. 47, No. 23, December 10, 2024
Rule 2 CCR 407-4-6 - PERMIT APPLICATION EXHIBIT REQUIREMENTS
6.1 REQUIREMENTS FOR SPECIFIC OPERATIONS
6.1.1General Provisions

This Rule provides for the specification of Exhibits required to be submitted along with each type of Permit application.

6.1.2110, 110(6) Limited Impact, 111 Special Operations

These operations shall provide all the Exhibits, as described in Rule 6.3 . Rule 6.5 (Geotechnical Stability Exhibit) may also be required on a case-by-case basis.

6.1.3112 Reclamation Permit Operations

These operations shall provide all the Exhibits, as described in Rule 6.4 . Rule 6.5 (Geotechnical Stability Exhibit) may also be required on a case-by-case basis.

6.2GENERAL REQUIREMENTS OF EXHIBITS
6.2.1General Requirements
(1) This Rule provides for the guidelines for, and information requirements of, each Exhibit required to be submitted with the permit application, as specified according to Rule 6.1.
(2) Maps and Exhibits

Maps, except the index map, must conform to the following criteria:

(a) show name of Applicant;
(b) must be prepared and signed by a registered land surveyor, professional engineer, or other qualified person;
(c) give date prepared;
(d) identify and outline the area which corresponds with the application;
(e) with the exception of the map of the affected lands required in Section 34-32.5-112(2)(d), C.R.S. 1984, as amended, shall be prepared at a scale that is appropriate to clearly show all elements that are required to be delineated by the Act and these Rules. The acceptable range of map scales shall not be larger than 1 inch = 50 feet nor smaller than 1 inch = 660 feet. Also, that a map scale, appropriate legend, map title, date and a north arrow shall be included.
6.3SPECIFIC PERMIT APPLICATION EXHIBIT REQUIREMENTS - 110 OR 110(6) LIMITED IMPACT and 111 SPECIAL OPERATIONS
6.3.1EXHIBIT A - Legal Description and Location Map
(1) The legal description must identify the affected land, specify affected areas and be adequate to field locate the property. Description shall be by (a) township, range, and section, to at least the nearest quarter-quarter section, and (b) location of the main entrance to the mine site reported as latitude and longitude, or the Universal Transverse Mercator (UTM) Grid as determined from a USGS topographic map. A metes and bounds survey description is acceptable in lieu of Township, Range, and Section. Where available, the street address or lot number(s) shall be given. This information may be available from the County Assessor's office or U.S. Geological Survey (USGS) maps.
(2) The main entrance to the mine site shall be located based on a USGS Topographic map showing latitude and longitude or Universal Transverse Mercator (UTM). The operator will need to specify coordinates of latitude and longitude in degrees, minutes and seconds or in decimal degrees to an accuracy of at least five (5) decimal places (e.g., latitude 37.12345 N, longitude 104.45678 W). For UTM, the operator will need to specify North American Datum (NAD) 1927, NAD 1983, or WGS 84, and the applicable zone, measured in meters.
(3) A map showing information sufficient to determine the location of the affected land on the ground and existing and proposed roads or access routes to be used in connection with the mining operation. Names of all immediately adjacent surface owners of record shall also be shown. A standard U.S. Geological Survey topographic quadrangle or equivalent is acceptable. The location of the proposed operation shall be shown and labeled with the mine site name.
6.3.2EXHIBIT B - Site Description

Items (a)-(c) below must be addressed to the extent necessary to demonstrate compliance with the applicable performance standard requirements of Rule 3. At a minimum, the Operator/Applicant shall include the following information:

(a) a description of the vegetation and soil characteristics in the area of the proposed operation. The local office of the Natural Resources Conservation Service (NRCS) may provide you with this information as well as recommendations for Exhibit D- Reclamation Plan;
(b) identify any permanent man-made structures within two hundred (200) feet of the affected area and the owner of each structure. Each structure should be located on Exhibit E- Map;
(c) a description of the water resources in the area of the proposed operation. Identify any streams, springs, lakes, stock water ponds, ditches, reservoirs, and aquifers that would receive drainage directly from the affected area. Provide any information available from publications or monitoring data on flow rates, water table elevations and water quality conditions; and
(d) A wildlife statement prepared by the Colorado Parks and Wildlife (CPW) is not required for 111 Special Operations, or 110, or 110(6) Limited Impact Operations. The Operator/Applicant may contact the local CPW representative to verify that no critical or important wildlife habitats or wildlife species will be impacted by the proposed operation.
6.3.3EXHIBIT C - Mining Plan

The purpose of the mining plan is to describe how mining will affect the permit area for the duration of the operation. This plan must be correlated to Exhibit E- Map. The description of the mining plan must be adequate to satisfy the requirements of Rule 3.1 and demonstrate compliance with Rule 3. At a minimum, the Operator/Applicant must include the following information:

(a) specify the estimated dates that mining will commence and end. If the operation is intended to be an intermittent operation as defined in C.R.S 34-32.5-103(11)(b), the Applicant should include in this exhibit a statement that conforms to the provisions of Section 34-32.5-103(11)(b), C.R.S.;
(b) the estimated depth to which soil, suitable as a plant growth medium, will be salvaged for use in the reclamation process. This description must be consistent with information provided in Exhibit B. Sufficient soil must be salvaged to meet the vegetation establishment criteria of Rule 3.1.10 . If plant growth medium is not reapplied on a graded area immediately after salvage, then the Operator/Applicant must specify how the topsoil will be stockpiled and stabilized with a vegetative cover or other means until used in reclamation. Plant growth medium stockpiles must be located separate from other stockpiles, out of the way of mine traffic and out of stream channels or drainage ways. The location of plant growth medium stockpiles must be shown on Exhibit E- Map;
(c) specify the thickness of overburden or quantity of waste rock, if any, to be removed to reach the deposit. The location of any overburden stockpiles or waste rock fills must be shown on Exhibit E- Map;
(d) specify the thickness of the deposit to be mined;
(e) describe the major components of the mining operation such as: roads and access routes, pit, office, shop/maintenance buildings, plant, processing facilities, and any underground openings such as adits or ventilation facilities. These components must be located on Exhibit E- Map;
(f) specify the dimensions of any significant disturbances to the land surface such as pit excavations, mine benches, impoundments, stockpiles, waste rock disposal areas, etc.;
(g) specify the dimensions of any existing or proposed roads that will be used for the mining operation. Describe any improvements necessary on existing roads and the specifications to be used in the construction of new roads. New or improved roads must be included as part of the affected lands and permitted acreage. Affected land shall not include off-site roads which existed prior to the date on which notice was given or permit application was made to the office and which were constructed for purposes unrelated to the proposed mining operation and which will not be substantially upgraded to support the mining operation. Describe any associated drainage and runoff conveyance structures to include sufficient information to evaluate structure sizing;
(h) specify how much water will be used in conjunction with the operation, and the source of this water;
(i) if groundwater will be encountered and/or surface water intercepted or disturbed, describe how mining will affect the quantity and quality of the surface or groundwater and the methods to be used to minimize disturbance to the surface and groundwater systems including proposed dewatering, sediment-containment or chemical treatment systems, storm water run-off controls, and groundwater points of compliance;
(j) specify how you will comply with applicable Colorado water laws and regulations governing injury to existing water rights;
(k) if refuse and acid or toxic producing materials are exposed during mining, describe how they shall be handled and disposed of in a manner that will control unsightliness and protect the drainage system from pollution;
(l) describe what measures will be taken to minimize disturbance to the hydrologic balance, prevent off-site damage, and provide for a stable configuration of the reclaimed area consistent with the proposed future land use;
(m) specify whether the deposit will be processed on-site. If the deposit will be processed, then describe the nature of the process, facilities and chemicals utilized. The process area and any structures must be described on Exhibit E- Map;
(n) identify the primary and secondary commodities to be mined/extracted and describe the intended use; and
(o) name and describe the intended use of all expected incidental products to be mined/extracted by the proposed operation.
(p) Specify if explosives will be used in conjunction with the mining or reclamation operation. In consultation with the Office, the Applicant must demonstrate, pursuant to Rule 6.5, Geotechnical Stability Exhibit, that off-site areas will not be adversely affected by blasting during mining or reclamation operations.
6.3.4 EXHIBIT D - Reclamation Plan
(1) The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be used to reclaim the affected land to the proposed future land use. This plan must be correlated to Exhibit E- Map. The description of the Reclamation Plan must be adequate to satisfy the requirements of Rule 3.1 and demonstrate compliance with Rule 3. At a minimum, the Application shall include the following information:
(a) specify at what point in the mining plan and to what depth(s) overburden will be replaced in relation to ongoing extraction.
(b) specify the maximum gradient of reclaimed slopes (horizontal:vertical). If the Application proposes slopes steeper than 3:1, the Operator/Applicant must include a justification that supports steeper slopes for the proposed post-mining land use, and demonstrates compliance with the applicable performance standards of Rule 3.1.
(c) specify the measures that will be taken to revegetate the site, if applicable, including
(i) state the thickness of plant growth medium to be replaced. Sample and analyze available soils sufficiently to establish quantity and quality;
(ii) state at what point in the mining plan the site will be seeded. Explain how the seedbed will be prepared to eliminate compacted conditions (e.g., plowed, chiseled, disced). State the type, application rate, and soil incorporation methods of fertilizer application, if any. NOTE: Soil amendments shall only be applied where soil tests indicate nutrient deficiencies for the plant species to be established;
(iii) state the grass, forb, shrub and tree species to be planted and the applicable quantities. Specify the quantity of each grass and forb species as pounds of pure live seed per acre;
(iv) specify the application method for grass and forb seeding. If the seed is to be broadcast, the application rate shall be twice the rate required for seed drilling. If the seedbed has not been adequately roughened prior to seeding, the seed shall be raked or harrowed after broadcast application;
(v) if a mulch is needed, specify the kind to be used, the crimping method, and rate of application; and
(vi) explain the establishment methods for each species of shrub and/or tree, and state the number of each to be established per acre.
(d) Specify which ponds, streams, roads and buildings, if any, will remain after reclamation. These features must be shown on the Exhibit E- Map. If ponds are part of the Reclamation Plan, slopes from five (5) vertical feet above to ten (10) vertical feet below the expected average water level cannot be steeper than 3H:1V; remaining slope lengths may not be steeper than 2H:1V. Where wildlife habitat is the proposed future land use, shorelines should be irregularly shaped to promote a diverse wildlife habitat. Colorado Parks and Wildlife (CPW) must be consulted where wildlife use is the proposed future land use.
(e) Specify the reclamation treatment of any waste rock dumps, underground mine openings, ditches, sediment control facilities, buildings and other features specified in your mine plan but not previously addressed in the Reclamation Plan narrative. These features must be shown on Exhibit E- Map. This should describe the measures taken to minimize disturbance to the hydrologic balance, prevent off-site damage, and provide for a stable configuration consistent with the proposed future land use.
(2) All 110 Limited Impact and 111 Special Operation applications must provide an estimate of the actual costs to reclaim the site based on what it would cost the State of Colorado using an independent contractor to complete reclamation. (Such estimates are not required for activities contemplated by the operator and approved by the Office to be outside the scope of the proposed reclamation plan.) The unit costs should include estimates for the following activities as appropriate to the operation: backfilling, grading, topsoil application, seeding, mulching, fertilization, and labor to complete reclamation. Determine and specify the point during the operation when the site has reached a point of maximum disturbance. The cost to reclaim the site to the specifications of the Reclamation Plan at this point must be estimated. Unit costs (cost per cubic yard), volumes, haul or push distances, and grades must be included when backfilling and grading are part of the Reclamation Plan. Volume and unit costs for finish grading, subsoil and topsoil application must be provided in terms of cost per cubic yard. The estimated cost for fertilizer, seed and mulch acquisition and application must be provided as cost per acre.
(a) Equipment costs must include such factors as equipment operator wages and benefits, fuel and lubricant consumption and depreciation. The cost to mobilize and demobilize the equipment from the nearest population center known to have the required equipment availability should be estimated.
(b) All items referenced in the Reclamation Plan must be included in the cost calculation. These items in addition to earthwork, such as building demolition, fencing, monitoring well sealing or stream channel reconstruction must also be included in the reclamation cost estimate.
(c) After the direct costs noted above have been estimated, the Office may add up to an additional maximum eighteen and one-half percent (18.5%) of that total, which includes private contract, typical overhead costs. This additional cost is required to cover indirect costs that an independent contractor would incur when performing reclamation of the site. Five percent (5%) additional cost shall be added to cover Office administration cost in the event of bond forfeiture and permit revocation.
6.3.5EXHIBIT E - Map
(1) In addition to the requirements of Rule 6.2.1, the Operator/Applicant must provide a map that clearly describes the features associated with the mining plan and the components of the Reclamation Plan. Include one (1) map for the mine plan and one (1) map for the Reclamation Plan. The map(s) must be drawn to a scale no smaller than appropriate to clearly show all elements that are required to be delineated by the Act and these Rules; show a north arrow, note any section corners adjacent to the proposed operation, and indicate the date illustrated. At a minimum, maps must include the following information:
(2)Mining Plan Map
(a) outline and label the permit boundaries, described in Exhibit A- Legal Description; for all 110 Limited Impact and 111 Special Operations, the Office considers the area bounded by the permit boundary to be analogous to the affected area;
(b) label the names of owner(s) of record of the surface of the affected area and of the land within two hundred (200) feet of the affected area, identify the owner of the substance to be mined, and the type of structure and owners of record of any permanent or man-made structures within two hundred (200) feet of the affected area;
(c) outline and label all major surface features to be used in connection with the proposed operation such as: existing and proposed roads, pit boundary, topsoil stockpiles, overburden stockpiles, product stockpiles, waste rock fills, stream channels, buildings, processing plant, underground openings such as adits or ventilation facilities, ponds, impoundments, dewatering pumps, diversions or waste disposal areas;
(d) indicate the direction that construction material extraction will proceed;
(e) note the location of any significant, valuable, and permanent man-made structures within two hundred (200) feet of the affected area. A narrative description must be provided in Exhibit B- Site Description; and
(f) outline and label existing disturbance within and/or adjacent to the permit boundary (e.g., previously mined areas, roads or excavations resulting from utility construction). Re-disturbance of previously disturbed areas, by the proposed mining operation, must be included in the permit area and addressed in Exhibit D- Reclamation Plan.
(3)Reclamation Plan Map
(a) show the gradient of all reclaimed slopes (horizontal:vertical) sufficient to describe the post mine topography;
(b) indicate where vegetation will not be established and the general area(s) for shrub or tree planting;
(c) if ponds are a part of the Reclamation Plan, outline the final shore configuration of the ponds and shallow areas if the future land use is for wildlife;
(d) state the average thickness of replaced overburden by reclamation area or phase; and
(e) state the average thickness of replaced topsoil by reclamation area or phase.
6.3.6EXHIBIT F - List of Other Permits and Licenses Required

Provide a statement identifying which of the following permits, licenses and approvals which are held or will be sought in order to conduct the proposed mining and reclamation operations: effluent discharge permits, air quality emissions permits, radioactive source materials licenses, disposal of dredge and fill material (404) permits, permit to construct a dam, well permits, explosives permits, State Historic Preservation Office clearance, highway access permits, U.S. Forest Service permits, Bureau of Land Management permits, county zoning and land use permits, and city zoning and land use permits.

6.3.7 EXHIBIT G - Source of Legal Right-to-Enter

Provide documentation of the legal right to enter to conduct mining and reclamation, for Owners of Record described in Rule 1.6.2 . This may include a copy of a lease, deed, abstract of title, a current tax receipt, or a signed statement by the Landowner(s) and acknowledged by a Notary Public stating that the Operator/Applicant has legal right to enter to conducting mining and reclamation.

6.3.8EXHIBIT H - Municipalities Within a Two-mile Radius

List the mailing address and telephone number of the governing body for all municipalities within a two (2) mile radius of the proposed mining operation.

6.3.9EXHIBIT I - Proof of Filing with County Clerk

An affidavit or receipt indicating the date on which the application was placed with the local County Clerk and Recorder for public review, pursuant to Rule 1.6.2(1)(c).

6.3.10EXHIBIT J - Proof of Mailing of Notices to Board of County Commissioners and Conservation District

Proof that notice of the permit application was sent to the Board of County Commissioners and, if the mining operation is within the boundaries of a Conservation District, to the Board of Supervisors of the local Conservation District, pursuant to Rule 1.6.2(1)(a)(ii).

6.3.11EXHIBIT K - Terms of Governmental Contract

For Special 111(1)(a) Operation applicants only, provide a copy of the signed government contract or other documentation verifying the necessity of a Special 111(1)(a) Operation permit. Provide any required evidence of Performance and Financial Warranties provided under the governmental contract.

6.3.12EXHIBIT L - Permanent Man-Made Structures

Where the affected lands are within two hundred (200) feet of any significant, valuable and permanent man-made structure, the applicant shall:

(a) provide a notarized agreement between the Applicant and the Person(s) having an interest in the structure, that the Applicant is to provide compensation for any damage to the structure; or
(b) where such an agreement cannot be reached, the Applicant shall provide an appropriate engineering evaluation that demonstrates that such structure shall not be damaged by activities occurring at the mining operation; or
(c) where such structure is a utility, the applicant may supply a notarized letter, on utility letterhead, from the owner(s) of the utility that the mining and reclamation activities, as proposed, will have "no negative effect" on their utility.
6.4SPECIFIC EXHIBIT REQUIREMENTS - 112 RECLAMATION OPERATION
6.4.1EXHIBIT A - Legal Description
(1) The legal description must identify the affected land, specify affected areas and be adequate to field locate the property. Description shall be by (a), township, range, and section, to at least the nearest quarter-quarter section and (b), location of the main entrance to the site reported as latitude and longitude, or the Universal Transverse Mercator (UTM) Grid as determined from a USGS topographic map. A metes and bounds survey description is acceptable in lieu of township, range, and section. Where available, the street address or lot number(s) shall be given. This information may be available from the County Assessor's office or U.S. Geological Survey (USGS) maps.
(2) The main entrance to the mine site shall be located based on a USGS Topographic map showing latitude and longitude or Universal Transverse Mercator (UTM). The operator will need to specify coordinates of latitude and longitude in degrees, minutes and seconds or in decimal degrees to an accuracy of at least five (5) decimal places (e.g., latitude 37.12345 N, longitude 104.45678 W). For UTM, the operator will need to specify North American Datum (NAD) 1927, NAD 1983, or WGS 84, and the applicable zone, measured in meters.
6.4.2EXHIBIT B - Index Map

An index map showing the regional location of the affected land and all roads and other access to the area. A standard U.S. Geological Survey topographic quadrangle or equivalent is acceptable. Scale criteria need not be followed for this map.

6.4.3EXHIBIT C - Pre-mining and Mining Plan Map(s) of Affected Lands

One or more maps may be necessary to legibly portray the following information:

(a) all adjoining surface owners of record;
(b) the name and location of all creeks, roads, buildings, oil and gas wells and lines, and power and communication lines on the area of affected land and within two hundred (200) feet of all boundaries of such area;
(c) the existing topography of the area with contour lines of sufficient detail to portray the direction and rate of slope of the affected land;
(d) the total area to be involved in the operation, including the area to be mined and the area of affected lands (see definition of "Affected Land");
(e) the type of present vegetation covering the affected lands; and
(f) in conjunction with Exhibit G- Water Information, Rule 6.4.7, if required by the Office, further water resources information will be presented on a map in this section.
(g) Show the owner's name, type of structures, and location of all significant, valuable, and permanent man-made structures contained on the area of affected land and within two hundred (200) feet of the affected land.
(h) In conjunction with Exhibit I- Soils Information, Rule 6.4.9, soils information may be presented on a map in this section.
(i) Aerial photos, if available, may be included in this section.
6.4.4EXHIBIT D - Mining Plan

The mining plan shall supply the following information, correlated with the affected lands, map(s) and timetables:

(a) description of the method(s) of mining to be employed in each stage of the operation as related to any surface disturbance on affected lands;
(b) earthmoving;
(c) all water diversions and impoundments; and
(d) the size of area(s) to be worked at any one time.
(e) An approximate timetable to describe the mining operation. The timetable is for the purpose of establishing the relationship between mining and reclamation during the different phases of a mining operation. An Operator/Applicant shall not be required to meet specific dates for initiation, or completion of mining in a phase as may be identified in the timetable. This does not exempt an Operator/Applicant from complying with the performance standards of Rule 3.1 . If the operation is intended to be an intermittent operation as defined in Section 34-32.5-103(11)(b), C.R.S., the Applicant should include in this exhibit a statement that conforms to the provisions of Section 34-32.5-103(11)(b), C.R.S. Such timetable should include:
(i) an estimate of the periods of time which will be required for the various stages or phases of the operation;
(ii) a description of the size and location of each area to be worked during each phase; and
(iii) outlining the sequence in which each stage or phase of the operation will be carried out.

(Timetables need not be separate and distinct from the mining plan, but may be incorporated therein.)

(f) A map (in Exhibit C- Pre-Mining and Mining Plan Maps(s) of Affected Lands, Rule 6.4.3) may be used along with a narrative to present the following information:
(i) nature, depth and thickness of the deposit to be mined and the thickness and type of overburden to be removed (may be marked "CONFIDENTIAL," pursuant to Rule 1.3(3)); and
(ii) nature of the stratum immediately beneath the material to be mined in sedimentary deposits.
(g) Identify the primary and secondary commodities to be mined/extracted and describe the intended use; and
(h) name and describe the intended use of all expected incidental products to be mined/extracted by the proposed operation.
(i) Specify if explosives will be used in conjunction with the mining (or reclamation). In consultation with the Office, the Applicant must demonstrate pursuant to Rule 6.5, Geotechnical Stability Exhibit, that off-site areas will not be adversely affected by blasting.
(j) Specify the dimensions of any existing or proposed roads that will be used for the mining operation. Describe any improvements necessary on existing roads and the specifications to be used in the construction of new roads. New or improved roads must be included as part of the affected lands and permitted acreage. Affected land shall not include off-site roads which existed prior to the date on which notice was given or permit application was made to the office and which were constructed for purposes unrelated to the proposed mining operation and which will not be substantially upgraded to support the mining operation. Describe any associated drainage and runoff conveyance structures to include sufficient information to evaluate structure sizing.
6.4.5EXHIBIT E - Reclamation Plan
(1) In preparing the Reclamation Plan, the Operator/Applicant should be specific in terms of addressing such items as final grading (including drainage), seeding, fertilizing, revegetation (trees, shrubs, etc.), and top soiling. Operators/Applicants are encouraged to allow flexibility in their plans by committing themselves to ranges of numbers (e.g., 6"-12" of topsoil) rather than specific figures.
(2) The Reclamation Plan shall include provisions for, or satisfactory explanation of, all general requirements for the type of reclamation proposed to be implemented by the Operator/Applicant. Reclamation shall be required on all the affected land. The Reclamation Plans shall include:
(a) A description of the type(s) of reclamation the Operator/Applicant proposes to achieve in the reclamation of the affected land, why each was chosen, the amount of acreage accorded to each, and a general discussion of methods of reclamation as related to the mechanics of earthmoving;
(b) A comparison of the proposed post-mining land use to other land uses in the vicinity and to adopted state and local land use plans and programs. In those instances where the post-mining land use is for industrial, residential, or commercial purposes and such use is not reasonably assured, a plan for revegetation shall be submitted. Appropriate evidence supporting such reasonable assurance shall be submitted;
(c) A description of how the Reclamation Plan will be implemented to meet each applicable requirement of Rule 3.1;
(d) Where applicable, plans for topsoil segregation, preservation, and replacement; for stabilization, compaction, and grading of spoil; and for revegetation. The revegetation plan shall contain a list of the preferred species of grass, legumes, forbs, shrubs or trees to be planted, the method and rates of seeding and planting, the estimated availability of viable seeds in sufficient quantities of the species proposed to be used, and the proposed time of seeding and planting;
(e) A plan or schedule indicating how and when reclamation will be implemented. Such plan or schedule shall not be tied to any specific date but shall be tied to implementation or completion of different stages of the mining operation as described in Rule 6.4.4 . The plan or schedule shall include:
(i) an estimate of the periods of time which will be required for the various stages or phases of reclamation;
(ii) A description of the size and location of each area to be reclaimed during each phase; and
(iii) An outline of the sequence in which each stage or phase of reclamation will be carried out.

(The schedule need not be separate and distinct from the Reclamation Plan, but may be incorporated therein.)

(f) A description of each of the following:
(i) Final grading - specify maximum anticipated slope gradient or expected ranges thereof;
(ii) Seeding- specify types, mixtures, quantities, and expected time(s) of seeding and planting;
(iii) Fertilization - if applicable, specify types, mixtures, quantities and time of application;
(iv) Revegetation - specify types of trees, shrubs, etc., quantities, size and location; and
(v) Top soiling - specify anticipated minimum depth or range of depths for those areas where topsoil will be replaced.
6.4.6EXHIBIT F - Reclamation Plan Map

The map(s) of the proposed affected land, by all phases of the total scope of the mining operation, shall indicate the following:

(a) The expected physical appearance of the area of the affected land, correlated to the proposed mining and reclamation timetables. The map must show proposed topography of the area with contour lines of sufficient detail to portray the direction and rate of slope of all reclaimed lands; and
(b) Portrayal of the proposed final land use for each portion of the affected lands.
6.4.7 EXHIBIT G - Water Information
(1) If the operation is not expected to directly affect surface or groundwater systems, a statement and sufficient demonstration of that expectation shall be submitted.
(2) If the operation is expected to directly affect surface or groundwater systems, the Operator/Applicant shall:
(a) Locate on the map (in Exhibit C) tributary water courses, wells, springs, stock water ponds, reservoirs, and ditches on the affected land and on adjacent lands where such structures may be affected by the proposed mining operations;
(b) Identify all known aquifers; and
(c) Submit a brief statement or plan showing how water from de-watering operations or from runoff from disturbed areas, piled material and operating surfaces will be managed to protect against pollution of either surface or groundwater (and, where applicable, control pollution in a manner that is consistent with water quality discharge permits), both during and after the operation.
(3) The Operator/Applicant shall provide an estimate of the project water requirements including flow rates and annual volumes for the development, mining and reclamation phases of the project.
(4) The Operator/Applicant shall indicate the projected amount from each of the sources of water to supply the project water requirements for the mining operation and reclamation.
(5) The Operator/Applicant shall affirmatively state that the Operator/Applicant has acquired (or has applied for) a National Pollutant Discharge Elimination System (NPDES) permit from the Water Quality Control Division at the Colorado Department of Health and Environment, if necessary.
6.4.8EXHIBIT H - Wildlife Information
(1) In developing the wildlife information, the Operator/Applicant may wish to contact the local wildlife conservation officer. The Operator/Applicant shall include in this Exhibit, a description of the game and non-game resources on and in the vicinity of the application area, including:
(a) a description of the significant wildlife resources on the affected land;
(b) seasonal use of the area;
(c) the presence and estimated population of threatened or endangered species from either federal or state lists; and
(d) a description of the general effect during and after the proposed operation on the existing wildlife of the area, including but not limited to temporary and permanent loss of food and habitat, interference with migratory routes, and the general effect on the wildlife from increased human activity, including noise.
(2) The application may be reviewed and commented upon by Colorado Parks and Wildlife (CPW). If CPW has comments, they must be provided prior to the end of the public comment period specified in Rule 1.7.1 to be considered by the Board and Office.
6.4.9EXHIBIT I - Soils Information
(1) In consultation with the Natural Resources Conservation Service (NRCS) or other qualified person, the Operator/Applicant shall indicate on a map (in Exhibit C) or by a statement, the general type, thickness and distribution of soil over the affected land. Such description will address suitability of topsoil (or other material) for establishment and maintenance of plant growth. If necessary, at its discretion, the Board may require additional information on soils or other growth media to be stockpiled and used in revegetation.
6.4.10EXHIBIT J - Vegetation Information
(1) The Operator/Applicant shall include in this Exhibit a narrative of the following items:
(a) descriptions of present vegetation types, which include quantitative estimates of cover and height for the principal species in each life-form represented (i.e., trees, tall shrubs, low shrubs, grasses, forbs);
(b) the relationship of present vegetation types to soil types, or alternatively, the information may be presented on a map; and
(c) estimates of average annual production for hay meadows and croplands, and carrying capacity for range lands on or in the vicinity of the affected land, if the choice of reclamation is for range or agriculture.
(2) The Operator/Applicant shall show the relation of the types of vegetation to existing topography on a map in Exhibit C. In providing such information, the Operator/Applicant may want to contact the local Conservation District.
6.4.11 EXHIBIT K- Climate

Provide a description of the significant climatological factors for the locality.

6.4.12EXHIBIT L- Reclamation Costs
(1) All information necessary to calculate the costs of reclamation must be submitted and broken down into the various major phases of reclamation. The information provided by the Operator/Applicant must be sufficient to calculate the cost of reclamation that would be incurred by the state.
(2) The Office may request the Operator/Applicant to provide additional, reasonable data to substantiate said Operator/Applicant's estimate of the cost of reclamation for all Affected Lands.
6.4.13EXHIBIT M- Other Permits and Licenses

A statement identifying which of the following permits, licenses and approvals the Operator/Applicant holds or will be seeking in order to conduct the proposed mining and reclamation operations: effluent discharge permits, air quality emissions permits, radioactive source material licenses, the State Historic Preservation Office clearance, disposal of dredge and fill material (404) permits, permit to construct a dam, well permits, explosives permits, highway access permits, U.S. Forest Service permits, Bureau of Land Management permits, county zoning and land use permits, and city zoning and land use permits.

6.4.14EXHIBIT N - Source of Legal Right to Enter

Provide documentation of the legal right to enter to conduct mining and reclamation, for Owners of Record described in Rule 1.6.2 . This may include a copy of a lease, deed, abstract of title, a current tax receipt, or a signed statement by the Landowner and acknowledged by a Notary Public stating that the Operator/Applicant has legal right to enter to conduct mining and reclamation.

6.4.15EXHIBIT O - Owner(s) of Record of Affected Land (Surface Area) and Owners of Substance to be Mined

The complete list of all owners can be submitted as a list or on a map in Exhibit C.

6.4.16EXHIBIT P - Municipalities Within Two Miles

A list of any municipality(s) within two (2) miles of the proposed mining operation and address of the general office of each municipality.

6.4.17 EXHIBIT Q - Proof of Mailing of Notices to Board of County Commissioners and Conservation District

Proof that notice, of the permit application was sent to the Board of County Commissioners and, if the mining operation is within the boundaries of a Conservation District, to the Board of Supervisors of the local Conservation District, pursuant to Rule 1.6.2(1)(a)(ii).

6.4.18EXHIBIT R - Proof of Filing with County Clerk and Recorder

An affidavit or receipt indicating the date on which the application was placed with the local County Clerk and Recorder for public review, pursuant to Rule1.6.2(1)(c).

6.4.19EXHIBIT S - Permanent Man-made Structures

Where the affected lands are within two hundred (200) feet of any significant, valuable and permanent man-made structure, the applicant shall:

(a) provide a notarized agreement between the Applicant and the Person(s) having an interest in the structure, that the Applicant is to provide compensation for any damage to the structure; or
(b) where such an agreement cannot be reached, the Applicant shall provide an appropriate engineering evaluation that demonstrates that such structure shall not be damaged by activities occurring at the mining operation; or
(c) where such structure is a utility, the Applicant may supply a notarized letter, on utility letterhead, from the owner(s) of the utility that the mining and reclamation activities, as proposed, will have "no negative effect" on their utility.
6.5GEOTECHNICAL STABILITY EXHIBIT
(1) On a site-specific basis, an Applicant shall be required to provide a geotechnical evaluation of all geologic hazards that have the potential to affect any proposed impoundment, slope, embankment, highwall, or waste pile within the affected area. A geologic hazard is one of several types of adverse geologic conditions capable of causing damage or loss of property and life. The Applicant may also be required to provide a geotechnical evaluation of all geologic hazards, within or in the vicinity of the affected lands, which may be de-stabilized or exacerbated by mining or reclamation activities.
(2) On a site-specific basis, an Applicant shall be required to provide engineering stability analyses for proposed final reclaimed slopes, highwalls, waste piles and embankments. An Applicant may also be required to provide engineering stability analyses for certain slopes configuration as they will occur during operations, including, but not limited to embankments. Information for slope stability analyses may include, but would not be limited to, slope angles and configurations, compaction and density, physical characteristics of earthen materials, pore pressure information, slope height, post-placement use of site, and information on structures or facilities that could be adversely affected by slope failure.
(3) Where there is the potential for off-site impacts due to failure of any geologic structure or constructed earthen facility, which may be caused by mining or reclamation activities, the Applicant shall demonstrate through appropriate geotechnical and stability analyses that off-site areas will be protected with appropriate factors of safety incorporated into the analysis. The minimum acceptable safety factors will be subject to approval by the Office, on a case-by-case basis, depending upon the degree of certainty of soil or rock strength determinations utilized in the stability analysis, depending upon the consequences associated with a potential failure, and depending upon the potential for seismic activity at each site.
(4) At sites where blasting is part of the proposed mining or reclamation plan, the Applicant shall demonstrate through appropriate blasting, vibration, geotechnical, and structural engineering analyses, that off-site areas will not be adversely affected by blasting.

2 CCR 407-4-6

42 CR 12, June 25, 2019, effective 7/15/2019