Where an uncertified building was constructed under a manufactured building program of another state and approved under such program, a TPIA shall prepare a report based on review of the plans and specifications and inspection of the building to assure that said plans and specifications meet the requirements of 780 CMR 13.00: Energy Efficiency and submit such to the Office for review and approval.
When the occupancy classification of a relocated manufactured building is proposed to be changed, a TPIA shall inspect the building, including any disassembly necessary, to determine whether compliance may be achieved for a change of occupancy classification in accordance with the requirements of Chapter 10 of 780 CMR 34.00: Existing Buildings. If factory plans are available, then disassembly is not required to the extent that the factory plans can be reasonably verified to reflect the actual construction.
Exception: Relocatable buildings previously approved with a prior Massachusetts insignia may be relocated into or within the state, subject to local approval for the design loads for the location, provided that no plan, specification, reconfiguration, occupancy type or use group changes are made. The insignia numbers, design loads, and plans based on time of manufacture shall be provided to the building official at time of permit application and prior to installation.
780 CMR, ch. 110.00, 780 CMR 110R3, 110.R3.1