Section 10.093 - Terms and Conditions of Temporary Construction Site Dewatering PermitsA Temporary Construction Site Dewatering Permit issued under 360 CMR 10.093 may require that the permittee:
(1) Limit the rate, time, and characteristic of its discharge;(2) Implement measures to regulate and/or equalize flow;(3) Install inspection, flow measurement, and sampling devices and/or facilities, and provide access to such devices and/or facilities;(4) Implement a monitoring program that may include measuring flow, conducting sampling, conducting chemical and biological testing, recording data, and submitting periodic reports;(5) Implement Pretreatment measures according to a specified schedule and submit periodic progress reports on implementation of the measures;(6) Comply with Best Management Practices that are described therein;(7) Submit discharge monitoring reports;(8) Pay service charges or fees;(9) Provide that its Wastewater Pretreatment facilities be operated by a person licensed according to state law, including 257 CMR 2.00: Rules and Regulations for Certification of Operators of Wastewater Treatment Facilities;(10) Prohibit the Discharge of contaminated groundwater;(11) Immediately cease discharging if the Discharge, alone or with other discharges, has an actual or potential adverse impact on the Authority Sewerage System, the operation of a combined sewer overflow, or the Authority's ability to comply with a law, regulation, permit, or order under which it operates; and(12) Take any other action deemed necessary or appropriate by the Authority to ensure compliance with 360 CMR 10.000 and/or with local, state or federal law.Amended by Mass Register Issue 1399, eff. 9/6/2019.Amended by Mass Register Issue 1526, eff. 7/19/2024.