Current through Register 1537, December 20, 2024
Section 10.074 - Permit Modifications(1) A permittee shall provide written notification to the Authority at least 30 days prior to taking any action which will change the volume or nature of the discharge including, but not limited to, the following actions: (a) expansion of the Landfill; or(b) alteration to the Pretreatment system or the operation of the Pretreatment system.(2) The Authority will review each notification and will thereafter inform the permittee whether the proposed change requires modification of the Permit. If Permit modification is necessary, the permittee shall file an application for a Permit modification as required by the Authority, and shall not change or alter its Discharge, unless and until the Authority approves the Permit modification.Amended by Mass Register Issue 1399, eff. 9/6/2019.