Current through Register 1536, December 6, 2024
Section 7.09 - U Dust, Odor, Construction, and Demolition(1) No person having control of any dust or odor generating operations such as, but not limited to asphalt batching plants, asphalt roofing materials manufacturing plants, asphalt blowing plants, foundries, chemical products manufacturing plants, incinerators, fuel utilization facilities, petroleum products manufacturing plants, aggregate manufacturing plants, food preparation or processing facilities, wood products plants, dry cleaning establishments, paint and varnish manufacturing plants, paper manufacturing plants, leather manufacturing plants, concrete batching plants, metal coating and treating plants, land clearing operations, construction work, dump operations, agricultural operations and street sweeping shall permit emissions therefrom which cause or contribute to a condition of air pollution.(2) No person responsible for any construction or demolition of an industrial, commercial, or institutional building or residential building with 20 or more dwelling units, shall cause, suffer, allow, or permit emissions therefrom which cause or contribute to a condition of air pollution. Said person shall notify the Department in writing ten working days prior to the initiation of said construction or demolition operation. The ten working day advance notice period will be waived in the event of emergency demolition necessary to prevent a public health or safety hazard.(3) No person responsible for an area where construction or demolition has taken place shall cause, suffer, allow, or permit particulate emissions therefrom to cause or contribute to a condition of air pollution by failure to seed, pave, cover, wet, or otherwise treat said area to prevent excessive emissions of particulate matter.(4) No person shall cause, suffer, allow, or permit the handling, transportation, or storage of any material in a manner that results or may result in emissions therefrom which cause or contribute to a condition of air pollution.(5) No persons responsible for any construction or demolition of a structure that contains friable asbestos material shall fail to comply with 310 CMR 7.09(2) and 310 CMR 7.02. (National Emission Standards for Hazardous Pollutants)(6) No person shall cause, suffer, allow, or permit the operation of mechanized street sweeping equipment that is not equipped with a suitable dust collection or dust suppression system which is maintained in good operating condition and is operated continuously while the street sweeping equipment is in use to prevent conditions of air pollution.(7)310 CMR 7.09(1) through 7.09(4) and 7.09(6) are subject to the enforcement provisions specified in 310 CMR 7.52.