105 CMR, § 120.833

Current through Register 1537, December 20, 2024
Section 120.833 - Facility Construction
(A) The Operator shall present facility construction plans to be approved by the Department prior to commencement of construction.
(B) The Operator may begin construction once the Department has determined that:
(1) The operator environmental monitoring program and Department environmental monitoring program, together with the detailed site characterization of the site, has yielded comprehensive baseline data.
(2) All required financial assurances have been accepted.
(3) All pre-construction conditions of the facility license have been satisfied.
(C) The Operator shall ensure that construction of the facility meets all the requirements of 105 CMR 120.800 and the license.
(D) The Board shall appoint a resident engineer who shall represent the Board daily at the site during construction of the facility and who shall, in cooperation with officials at each site community, check, inspect, and report to the Board as to events at the construction site.
(E) The Department will periodically inspect the construction process to ensure that the requirements of 105 CMR 120.800 and the license are being met.
(F) The Operator shall construct, install, and make additions and improvements to such structures and equipment as are determined by the Department to be necessary.

105 CMR, § 120.833