Section R20-5-409 - Notification and Preparation for Inspection
A. An Authorized Inspector shall perform a Certificate Inspection at a time mutually agreeable to the Authorized Inspector and the Owner, Operator, or User.
B. Before an Authorized Inspector performs an Internal Inspection of a Boiler, an Owner, Operator, or User shall:
1. Cool the furnace and combustion chambers;
2. Drain the water from the Boiler;
3. Remove the manhole and handhole plates, wash-out plugs, inspection plugs in water column connections , and disassemble all low-water fuel cutoff float chambers or bowls;
4. Remove insulation or brickwork if necessary to determine the condition of the Boiler, headers, furnace, supports, and other parts;
5. Remove the pressure gauge for testing;
6. Prevent any leakage of steam or hot water into the boiler by disconnecting the involved pipe or valve;
7. Close, tag, and padlock the non-return and steam stop valves before opening the manhole or handhole covers and entering any part of the steam generating unit that is connected to a common header with other Boilers. Open the free blow drain or cock between the non-return and steam stop valves;
8. Close, tag, and padlock the blowoff valves after draining the Boiler: and
9. Open all drains and vent lines.