Ariz. Admin. Code § 18-2-402

Current through Register Vol. 30, No. 50, December 13, 2024
Section R18-2-402 - General
A. The preconstruction review requirements of this Article shall apply to the construction of any new major source or any project at an existing major source.
B. The requirements of R18-2-403 through R18-2-410 apply to the construction of any new major source or any major modification of any existing major source, except as this Article otherwise provides.
C. No person shall begin actual construction of a new major source or a major modification subject to the requirements of R18-2-403 through R18-2-410 without first obtaining a proposed final permit from the Director, pursuant to R18-2-307(A)(2), stating that the major source or major modification shall meet those requirements.
D. The requirements of this Article apply to projects at major sources in accordance with the following principles.
1. Except as otherwise provided in subsection (E), a project is a major modification for a regulated NSR pollutant if it causes both a significant emissions increase and a significant net emissions increase. The project is not a major modification if it does not cause a significant emissions increase. If the project causes a significant emissions increase, then the project is a major modification only if it also results in a significant net emissions increase.
2. The procedure for calculating before beginning actual construction whether a significant emissions increase will occur depends upon the types of emissions units being modified as set forth in subsections (D)(3) through (6). The procedure for calculating before beginning actual construction whether a significant net emissions increase will occur at the major source is set forth in the definition of net emissions increase in R18-2-101. Regardless of any such preconstruction projections, a major modification results if the project causes a significant emissions increase and a significant net emissions increase.
3. Actual-to-projected-actual applicability test for projects that only involve existing emissions units. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the difference between the projected actual emissions and the baseline actual emissions, for each existing emissions unit, equals or exceeds the significant amount for that pollutant.
4. Actual-to-potential applicability test for projects that only involve new emissions units. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the difference between the potential to emit from each new emissions unit following completion of the project and the baseline actual emissions of these units before the project equals or exceeds the significant amount for that pollutant.
5. [Reserved.]
6. Hybrid applicability test for projects that involve both new emissions units and existing emissions units. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the emissions increases for each emissions unit, using the method specified in subsections (D)(3) through (D)(4), as applicable with respect to each emissions unit, equals or exceeds the significant amount for that pollutant.
E. Any major source with a PAL for a regulated NSR pollutant shall comply with R18-2-412.
F. This subsection applies with respect to any regulated NSR pollutant emitted from projects at existing emissions units at a major stationary source (other than projects at a source with a PAL) in circumstances where there is a reasonable possibility, within the meaning of subsection (F)(6) , that a project that is not a part of a major modification may result in a significant emissions increase of such pollutant and the owner or operator elects to use the method specified in R18-2-401(23)(b)(i) through (iv) of the definition of projected actual emissions for calculating projected actual emissions.
1. Before beginning actual construction of the project, the owner or operator shall document and maintain a record of the following information:
a. A description of the project;
b. Identification of the emissions unit(s) with emissions of a regulated NSR pollutant that could be affected by the project;
c. A description of the applicability test used to determine that the project is not a major modification for any regulated NSR pollutant, including the baseline actual emissions, the projected actual emissions the amount of emissions excluded under R18-2-401(23)(b)(iv) of the definition of projected actual emissions, and an explanation for why such amount was excluded; and
d. Any netting calculations, if applicable.
2. If the emissions unit is an existing electric utility steam generating unit, before beginning actual construction, the owner or operator shall provide a copy of the information set out in subsection (F)(1) to the Director. Nothing in this subsection shall be construed to require the owner or operator of such a unit to obtain any determination from the Director before beginning actual construction.
3. The owner or operator shall monitor the emissions of any regulated NSR pollutant that could increase as a result of the project and that is emitted by any emissions unit identified in subsection (F)(1)(b); and calculate and maintain a record of the annual emissions, in tons per year on a calendar year basis, for a period of five years following resumption of regular operations after the change, or for a period of 10 years following resumption of regular operations after the change if the project increases the design capacity or potential to emit of that regulated NSR pollutant at such emissions unit. For purposes of this subsection, fugitive emissions (to the extent quantifiable) shall be monitored if the emissions unit is part of a section 302(j) category or if the emissions unit is located at a major stationary source that belongs to a section 302(j) category.
4. The owner or operator shall submit a report to the Director if for a calendar year the annual emissions, in tons per year, from the project identified in subsection (F)(1) exceed the sum of the baseline actual emissions, as documented and maintained under subsection (F)(1)(c), by a significant amount for that regulated NSR pollutant, and if the emissions differ from the precon-struction projection as documented and maintained under subsection (F)(1)(c). The owner or operator shall submit the report to the Director within 60 days after the end of the calendar year. The report shall contain the following:
a. The name, address and telephone number of the major source;
b. The annual emissions as calculated pursuant to subsection (F)(3); and
c. Any other information that the owner or operator wishes to include in the report, such as an explanation as to why the emissions differ from the preconstruction projection.
5. Notwithstanding subsection (F)(4), if any existing emissions unit identified in subsection (F)(1)(b) is an electric utility steam generating unit, the owner or operator shall submit a report to the Director within 60 days after the end of each calendar year during which the owner or operator must generate records under subsection (F)(3). The report shall document the unit's post-project annual emissions during the calendar year that preceded submission of the report.
6. A "reasonable possibility" under subsection (F) occurs when the owner or operator calculates the project to result in one of the following:
a. A projected actual emissions increase of at least 50% of the amount that is a significant emissions increase (without reference to the amount that is a significant net emissions increase) for the regulated NSR pollutant.
b. A projected actual emissions increase that, added to the amount of emissions excluded under subsection R18-2-401(23)(b)(iv) of the definition of projected actual emissions, sums to at least 50% of the amount that is a significant emissions increase (without reference to the amount that is a significant net emissions increase) for the regulated NSR pollutant. For a project for which a reasonable possibility occurs only within the meaning of subsection (F)(6)(b), and not also within the meaning of subsection (F)(6)(a), subsections (F)(2) through (5) do not apply to the project.
7. The owner or operator of the source shall make the information required to be documented and maintained under subsection (F) available for review upon request for inspection by the Department or the general public.
G. An application for a permit or permit revision under this Article, other than a PAL permit pursuant to R18-2-412, shall not be considered complete unless the application demonstrates that:
1. The requirements in subsection (H) are met;
2. The more stringent of the applicable new source performance standards or the existing source performance standards in Article 7 of this Chapter are applied to the proposed new major source or major modification of a major source;
3. The visibility requirements contained in R18-2-410 are satisfied;
4. All applicable provisions of Article 3 of this Chapter are met;
5. The new major source or major modification will be in compliance with whatever emission limitation, design, equipment, work practice or operational standard, or combination thereof is applicable to the source or modification. The degree of emission limitation required for control of any pollutant under this Article shall not be affected in any manner by:
a. Stack height in excess of GEP stack height except as provided in R18-2-332; or
b. Any other dispersion technique, unless implemented prior to December 31, 1970;
6. The new major source or major modification will not exceed the applicable standards for hazardous air pollutants contained in this Chapter;
7. The new major source or major modification will not exceed the limitations, if applicable, on emission from nonpoint sources contained in Article 6 of this Chapter;

8. The new major source or major modification will not have an adverse impact on visibility, as determined according to R18-2-410.
H. Except for assessing air quality impacts within federal Class I areas, the air impact analysis required to be conducted as part of a permit application shall initially consider only the geographical area located within a 50 kilometer radius from the point of greatest emissions for the new major source or major modification. The Director, on his own initiative or upon receipt of written notice from any person shall have the right at any time to request an enlargement of the geographical area for which an air quality impact analysis is to be performed by giving the person applying for the permit or permit revision written notice thereof, specifying the enlarged radius to be so considered. In performing an air impact analysis for any geographical area with a radius of more than 50 kilometers, the person applying for the permit or permit revision may use monitoring or modeling data obtained from major sources having comparable emissions or having emissions which are capable of being accurately used in such demonstration, and which are subjected to terrain and atmospheric stability conditions which are comparable or which may be extrapolated with reasonable accuracy for use in such demonstration.
I. The Director shall comply with following requirements with respect to an application for a permit or permit revision subject to this Article:
1. Within 60 days after receipt of the application , or any addition to the application, the Director shall advise the applicant of any deficiency. The date of receipt of a complete application shall be, for the purpose of this Section, the date on which the Director receives all required information. The permit application shall not be deemed complete if the Director fails to meet the requirements of this subsection.
2. Within one year after receipt of a complete application, the Director shall do all of the following:
a. Make a preliminary determination as to whether the permit or permit revision should be granted or denied.
b. Make the application, all materials the applicant submitted, the preliminary determination, and materials relating to the application available under R18-2-330(D).
c. Notify the public of the application, the preliminary determination and the opportunity for a public hearing and to submit written comments in accordance with R18-2-330(C). In the case of an application subject to R18-2-406, the notice shall include the degree of consumption of the maximum allowable increases allowed under R18-2-218 that is expected to occur as a result of emissions from the proposed source or modification.
d. Take final action on the application by denying the permit or permit revision or issuing a proposed final permit or permit revision.
e. Notify the applicant in writing of the approval or denial and make the notification, comments on the proposed action, and materials supporting the final action available for public inspection at the location where materials relating to the proposed action were placed under R18-2-330(D).
3. A copy of any notice required by R18-2-330 and subsection (I)(2)(c) shall be sent to the permit applicant, to the Administrator, and to the following officials and agencies having cognizance over the location where the proposed major source or major modification would occur:
a. The air pollution control officer, if one exists, for the county wherein the proposed or existing source that is the subject of the permit or permit revision application is located;
b. The county manager for the county wherein the proposed or existing source that is the subject of the permit or permit revision application is located;
c. The city or town managers of the city or town which contains, and any city or town the boundaries of which are within 5 miles of, the location of the proposed or existing source that is the subject of the permit or permit revision application;
d. Any regional land use planning agency with authority for land use planning in the area where the proposed or existing source that is the subject of the permit or permit revision application is located; and
e. Any state, Federal Land Manager, or Indian governing body whose lands may be affected by emissions from the proposed source or modification.

J. The authority to construct and operate a new major source or major modification under a permit or permit revision issued under this Article shall terminate if the owner or operator does not commence the proposed construction or major modification within 18 months of issuance or if, during the construction or major modification, the owner or operator suspends work for more than 18 months. The Director may extend the 18-month period upon a satisfactory showing that an extension is justified. This provision does not apply to the time period between construction of the approved phases of a phased construction project; each phase must commence construction within 18 months of the projected and approved commencement date.

Ariz. Admin. Code § R18-2-402

Amended effective August 6, 1976 (Supp. 76-4). Former Section R9-3-402 repealed, new Section R9-3-402 adopted effective May 14, 1979 (Supp. 79-1). Amended and adopted by reference Open Burning Guidelines for Air Pollution Control effective September 22, 1983 (Supp. 83-5). Former Section R9-3-402 renumbered without change as Section R18-2-402 (Supp. 87-3). Section R18-2-402 renumbered to R18-2-602, new Section R18-2-402adopted effective November 15, 1993 (Supp. 93-4). Amended by final rulemaking at 18 A.A.R. 1542, effective August 7, 2012 (Supp. 12-2). Amended by final rulemaking at 23 A.A.R. 333, effective 3/21/2017.