Ariz. Admin. Code § 18-15-106

Current through Register Vol. 30, No. 45, November 8, 2024
Section R18-15-106 - Environmental Review
A. The Authority shall conduct an environmental review according to this Section for impacts of the design or construction of water infrastructure. As part of the application process, the Authority shall request information from the applicant to conduct an environmental review consistent with 40 CFR 35.3140 and 40 CFR 35.3580. The Authority shall determine whether the project meets the criteria for categorical exclusion under subsections (B) and (C), or whether the project requires the preparation of an environmental assessment (EA) or an environmental impact statement (EIS) to identify and evaluate its environmental impacts.
1. The Authority shall not execute a technical or financial assistance agreement with an applicant until the requirements of this section are met. For projects that include an environmental information document or an environmental impact statement, the Authority may execute a technical or financial assistance agreement with an applicant prior to the completion of the conditions of this section, provided that the applicant meets the requirements of this section before proceeding with the design of the selected alternative.
2. Projects under the Water Supply Development Revolving Fund Program are not subject to the requirements of this section.
B. A project may be categorically excluded from environmental review if the project fits within a category that is eligible for exclusion and the project does not involve any of the extraordinary circumstances listed in subsection (C). If, based on the application and other information submitted by the applicant, the Authority determines that a categorical exclusion from an environmental review is warranted, the project is exempt from the requirements of this Section, except for the public notice and participation requirements in subsection (J). The Authority may issue a categorical exclusion if information and documents demonstrate that the project qualifies under one or more of the following categories:
1. Any project relating to existing infrastructure systems that involves minor upgrading, minor expansion of system capacity, rehabilitation (including functional replacement) of the existing system and system components, or construction of new minor ancillary facilities adjacent to or on the same property as existing facilities. This category does not include projects that:
a. Involve new or relocated discharges to surface water or groundwater,
b. Will likely result in the substantial increase in the volume or the loading of pollutant to the receiving water,
c. Will provide capacity to serve a population 30% greater than the existing population,
d. Are not supported by the state or other regional growth plan or strategy, or
e. Directly or indirectly involve or relate to upgrading or extending infrastructure systems primarily for the purposes of future development.
2. Any clean water project in unsewered communities involving the replacement of existing onsite systems, providing the new onsite systems do not result in substantial increases in the volume of discharge or the loadings of pollutants from existing sources, or relocate an existing discharge.
C. The Authority shall deny a categorical exclusion if any of the following extraordinary circumstances apply to the project:
1. The project is known or expected to have potentially significant adverse environmental impacts on the quality of the human environment either individually or cumulatively over time.
2. The project is known or expected to have disproportionately high and adverse human health or environmental effects on any community, including minority communities, low-income communities, or federally-recognized Indian tribal communities.
3. The project is known or expected to significantly affect federally listed threatened or endangered species or their critical habitat.
4. The project is known or expected to significantly affect national natural landmarks or any property with nationally significant historic, architectural, prehistoric, archaeological, or cultural value, including but not limited to, property listed on or eligible for the Arizona or National Registers of Historic Places.
5. The project is known or expected to significantly affect environmentally important natural resource areas such as wetlands, floodplains, significant agricultural lands, aquifer recharge zones, wild and scenic rivers, and significant fish or wildlife habitat.
6. The project is known or expected to cause significant adverse air quality effects.
7. The project is known or expected to have a significant effect on the pattern and type of land use or growth and distribution of population, including altering the character of existing residential areas, or may not be consistent with state or local government, or federally-recognized Indian tribe approved land use or federal land management plans.
8. The project is known or expected to cause significant public controversy about a potential environmental impact of the proposed action.
9. The project is known or expected to be associated with providing financial assistance to a federal agency through an interagency agreement for a project that is known or expected to have potentially significant environmental impacts.
10. The project is known or expected to conflict with federal, state, or local government, or federally-recognized Indian tribe environmental, resource-protection, or land-use laws or regulations.
D. If the Authority denies the categorical exclusion under subsection (C), the Authority shall conduct an EA according to subsection (E), unless the Authority decides to prepare an EIS according to subsections (F) and (G) without first undertaking an EA. If the Authority conducts an EA, the applicant shall:
1. Prepare an environmental information document (EID) in a format prescribed by the Authority. The EID shall be of sufficient scope to undertake an environmental review and to allow development of an EA under subsection (E); or
2. Provide documentation, upon Authority approval, in another format if the documentation is of sufficient scope to allow the development of an EA under subsection (E).
E. The Authority shall conduct the EA that includes:
1. A brief discussion of:
a. The need for the project;
b. The alternatives, including a no action alternative;
c. The affected environment, including baseline conditions that may be impacted by the project and alternatives;
d. The environmental impacts of the project and alternatives, including any unresolved conflicts concerning alternative uses of available resources; and
e. Other applicable environmental laws.
2. A listing or summary of any coordination or consultation undertaken with any federal agency, state or local government, or federally-recognized Indian tribe regarding compliance with applicable laws and executive orders;
3. Identification and description of any mitigation measures considered, including any mitigation measures that must be adopted to ensure the project will not have significant impacts; and
4. Incorporation of documents by reference, if appropriate, including the EID.
F. Upon completion of the EA required by subsection (E), the Authority shall determine whether an environmental impact statement (EIS) is necessary.
1. The Authority shall prepare or direct the applicant to prepare an EIS in the manner prescribed in subsection (G) if any of the following conditions exist.
a. The project would result in a discharge of treated effluent from a new or modified existing facility into a body of water and the discharge is likely to have a significant effect on the quality of the receiving water.
b. The project is likely to directly, or through induced development, have significant adverse effect upon local ambient air quality or local ambient noise levels.
c. The project is likely to have significant adverse effects on surface water reservoirs or navigation projects.
d. The project would be inconsistent with state or local government, or federally-recognized Indian tribe approved land use plans or regulations, or federal land management plans.
e. The project would be inconsistent with state or local government, or federally-recognized Indian tribe environmental, resource-protection, or land-use laws and regulations for the protection of the environment.
f. The project is likely to significantly affect the environment through the release of radioactive, hazardous, or toxic substances, or biota.
g. The project involves uncertain environmental effects or highly unique environmental risks that are likely to be significant.
h. The project is likely to significantly affect national natural landmarks or any property on or eligible for the Arizona or National Registers of Historic Places.
i. The project is likely to significantly affect environmentally important natural resources such as wetlands, significant agricultural lands, aquifer recharge zones, wild and scenic rivers, and significant fish or wildlife habitat.
j. The project in conjunction with related federal, state, or local government, or federally-recognized Indian tribe projects is likely to produce significant cumulative impacts.
k. The project is likely to significantly affect the pattern and type of land use or growth and distribution of population, including altering the character of existing residential areas.
l. The project is a new regional wastewater treatment facility or water supply system for a community with a population greater than 100,000.
m. The project is an expansion of an existing wastewater treatment facility that will increase existing discharge to an impaired water by more than 10 million gallons per day (mgd).
2. The Authority may issue a finding of no significant impact (FONSI) if the EA supports the finding that the project will not have a significant impact on the environment. The FONSI shall include the submitted EA and a brief description of the project, alternatives considered, and project impacts. The FONSI must also include any commitments to mitigation that are essential to render the impacts of the project not significant. The Authority shall issue the FONSI for public comment in accordance with subsection (J).
G. The Authority shall prepare or direct the applicant to prepare an EIS required by subsection (F)(1) when the project will significantly impact the environment, including any project for which the EA analysis demonstrates that significant impacts will occur and not be reduced or eliminated by changes to, or mitigation of, the project. The Authority shall perform the following actions:
1. As soon as practicable after its decision to prepare an EIS and before the scoping process, the Authority shall prepare a notice of intent. The notice of intent shall briefly describe the project and possible alternatives and the proposed scoping process. The Authority shall distribute the notice of intent to affected federal, state, and local agencies, any affected Indian tribe, the applicant, and other interested parties. The Authority shall issue the notice of intent for public comment in accordance with subsection (J)(3).
2. As soon as possible after the distribution and publication of the notice of intent required by subsection (G)(1), the Authority shall convene a meeting of affected federal, state, and local agencies, affected Indian tribes, the applicant, and other interested parties.

At the meeting, the parties attending the meeting shall determine the scope of the EIS by considering a number of factors, including all of the following:

a. The significant issues to be analyzed in depth in the EIS,
b. The preliminary range of alternatives to be considered,
c. The potential cooperating agencies and information or analyses that may be needed from cooperating agencies or other parties, and
d. The method for EIS preparation and the public participation strategy.
3. Upon completion of the process described in subsection (G)(2), the Authority shall identify and evaluate all potentially viable alternatives to adequately address the range of issues identified. Additional issues also may be addressed, or others eliminated, and the reasons documented as part of the EIS.
4. After the analysis of issues is conducted according to subsection (G)(3), the Authority shall issue a draft EIS for public comment according to subsection (J)(4).
5. Following public comment according to subsection (J), the Authority shall prepare a final EIS, consisting of all of the following:
a. The draft EIS;
b. An analysis of all reasonable alternatives and the no action alternative;
c. A summary of any coordination or consultation undertaken with any federal, state, or local government, or federally-recognized Indian tribe;
d. A summary of the public participation process;
e. Comments received on the draft EIS;
f. A list of persons commenting on the draft EIS;
g. The Authority's responses to significant comments received;
h. A determination of consistency with the Certified Water Quality Management Plan, if applicable;
i. The names and qualifications of the persons primarily responsible for preparing the EIS; and
j. Any other information added by the Authority.
6. The Authority shall prepare or direct the applicant to prepare a supplemental EIS when appropriate, including when substantial changes are made to the project that are relevant to environmental concerns, or when there are significant new circumstances or information relevant to environmental concerns bearing on the project.
H. After issuance of a final EIS under subsection (G)(5), the Authority shall prepare and issue a record of decision (ROD) containing the Authority's decision whether to proceed or not proceed with a project. A ROD issued with a decision to proceed shall include a brief description of the project, alternatives considered, and project impacts. In addition, the ROD must include any commitments to mitigation, an explanation if the environmental preferred alternative was not selected, and any responses to substantive comments on the final EIS. A ROD issued with a decision not to proceed shall preclude the project from receiving financial assistance under this Article.
I. For all determinations (categorical exclusions, FONSIs, or RODs) that are five years old or older and for which the project has not been implemented, the Authority shall re-evaluate the project, environmental conditions, and public views to determine whether to conduct a supplemental environmental review of the project and complete an appropriate environmental review document or reaffirm the Authority's original determination. The Authority shall provide public notice of the re-evaluation according to subsection (J)(5).
J. The Authority shall conduct public notice and participation under this Section as follows:
1. If a categorical exclusion is granted under subsection (B), the Authority shall provide public notice of that fact by publishing the notice as a legal notice at least once, in one or more newspapers of general circulation in the county or counties concerned.
2. If a FONSI is issued under subsection (F)(2), the Authority shall provide public notice that the FONSI is available for public review by publishing the notice as a legal notice at least once in one or more newspapers of general circulation in the county or counties concerned. The notice shall provide that comments on the FONSI may be submitted to the Authority for a period of 30 days from the date of publication of the notice. If no comments are received, the FONSI shall immediately become effective. The Authority may proceed with the project subject to any mitigation measures described in the FONSI after responding to any substantive comments received on the FONSI during the 30-day comment period, or 30 days after issuance of the FONSI if no substantive comments are received.
3. If a notice of intent is prepared and distributed under subsection (G)(1), the Authority shall publish it as a legal notice at least once, in one or more newspapers of general circulation in the county or counties concerned.
4. If a draft EIS is issued under subsection (G)(4), the Authority shall provide public notice by publishing the notice as a legal notice at least once, in one or more newspapers of general circulation in the county or counties concerned, that the draft EIS is available for public review. The notice shall provide that comments on the draft EIS may be submitted to the Authority for a period of 45 days from the date of publication of the notice. When the Authority determines that a project may be controversial, the notice shall provide for a general public hearing to receive public comments.
5. If the Authority reaffirms or revises a decision according to subsection (I), the Authority shall provide public notice of that fact by publishing the notice as a legal notice at least once, in one or more newspapers of general circulation in the county or counties concerned.

Ariz. Admin. Code § R18-15-106

Adopted effective September 18, 1997 (Supp. 97-3). Amended by final rulemaking at 7 A.A.R. 5956, effective December 4, 2001 (Supp. 01-4). Section repealed; new Section made by final rulemaking at 16 A.A.R. 1709, effective October 9, 2010 (Supp. 10-3). Section repealed; new R18-15-106 renumbered from R18-15-107 and amended at 16 A.A.R. 1709, effective October 9, 2010 (Supp. 10-3). Amended by final rulemaking at 24 A.A.R. 239, effective 3/11/2018.