Current through Register Vol. 30, No. 49, December 6, 2024
Section R12-7-126 - Application to Plug and AbandonA. Before abandoning any well, the operator shall submit an application to plug and abandon to the Commission and obtain approval. The application shall set forth the name and location of the well, the mechanical condition of the well, the productive zone and latest production, and a complete description of the proposed work. The plan shall provide for the protection of all formations containing usable-quality water, oil, gas, or geothermal resources.B. In the case of a drilling well or an emergency, the application may be made by electronic communication, and the Commission may by electronic communication authorize the work; however, the operator shall file a written application within 10 days after the emergency authorization is given even though the work has already been commenced or completed. The Commission shall confirm the emergency authorization in writing upon receipt of the written application.Ariz. Admin. Code § R12-7-126
Former Rule 201; Amended effective September 29, 1982 (Supp. 82-5). Amended effective January 2, 1996 (Supp. 96-1).