F is the total fuel cost per kilowatt-hour;
NF is the total nonfuel cost per kilowatt-hour; and
A is other assistance per kilowatt-hour that reduces a customer's rate on a kilowatt-hour basis and that is provided to the utility within 60 days before the commission determines the power cost equalization per kilowatt-hour; and
B is the base amount established by order of the commission under (c) of this section.
3 AAC 52.610
Authority:AS 42.05.141
AS 42.05.151
AS 42.45.110
AS 42.45.130
AS 42.45.160
AS 42.45.170