Current through September 25, 2024
Section 3 AAC 107.230 - Exclusions from power cost equalization(a) A customer whose facility has more than one meter will only receive power cost equalization credit for the master meter.(b) Power consumption measured by a station service meter required in 3 AAC 107.200 is not eligible for power cost equalization credit.Eff. 2/16/96, Register 137Authority:AS 42.45.100
AS 42.45.110
AS 42.45.160
AS 42.45.170
AS 44.83.080