For downhole service operations not covered by 20 AAC 25.285 - 20 AAC 25.287, the commission will approve alternate well control procedures and equipment, if the commission determines that the alternate procedures and equipment are adequate to ensure well control.
20 AAC 25.288
Authority:AS 31.05.030