Current through September 25, 2024
Section 18 AAC 75.405 - Pre-application notification and consultation for oil discharge prevention and contingency plans; new plans and plan renewals(a) At least 60 days before the scheduled submission date for an application package for approval of a new oil discharge prevention and contingency plan under 18 AAC 75.410 or for renewal of approval under 18 AAC 75.420, the applicant must notify the department in writing of its intent to submit an application.(b) The applicant must consult with the department at least 30 days before the scheduled submission date for the application package to ensure that the application meets the requirements of 18 AAC 75.408 and the requirements of 18 AAC 75.410 or 18 AAC 75.420, to discuss the contents of the proposed plan, and to discuss the review process under 18 AAC 75.455.(c) Pre-application notification and consultation is not required for a streamlined plan application submitted under 18 AAC 75.421.(d) Upon satisfying the requirements under (a) and (b) of this section, the application package may be submitted to the department without waiting the 60 days specified in (a) of this section and without waiting the 30 days specified in (b) of this section.Eff. 5/14/92, Register 122; am 11/27/2002, Register 164; am 4/16/2016, Register 218, July 2016; am 3/23/2017, Register 221, April 2017; am 10/27/2018, Register 228; am 11/7/2020, Register 236, January 2021; am 2/5/2023, Register 245, April 2023A notification may be submitted to the department inbox at dec.odpcp.submissions@alaska.gov.
Authority:AS 46.03.020
AS 46.04.030
AS 46.04.050
AS 46.04.055
AS 46.04.070