If the design, construction, or location of a meter requires a testing procedure involving special equipment or accessories, or an abnormal amount of labor, the owner or operator of the meter shall supply equipment, accessories, and labor required by the division.
17 AAC 90.580
Authority:AS 45.75.040
AS 45.75.050
AS 45.75.070
AS 45.75.080