Summary
In 22 Irving Place Corp, v 30 Irving LLC (57 Misc.3d 253 [Sup Ct, New York County 2017]), a case involving similar claims as those here, the court denied the plaintiff's motion for a preliminary injunction to immediately remove a sidewalk bridge pursuant to RPAPL § 881 and granted the defendant's cross-motion to dismiss plaintiff s claims sounding in trespass and private nuisance.
Summary of this case from 276-W71 LLC v. Bd. of Managers of 240 W. End Ave Condo.Opinion
159279/2016.
06-26-2017
Wrobel Markham Schatz Kaye & Fox LLP (David C. Wrobel of counsel) for plaintiff. Smith & Shapiro (Harry Shapiro of counsel) for defendants.
Wrobel Markham Schatz Kaye & Fox LLP (David C. Wrobel of counsel) for plaintiff.
Smith & Shapiro (Harry Shapiro of counsel) for defendants.
DAVID B. COHEN, J.
It is
Decided that plaintiff's motion for an injunction pursuant to RPAPL 871 or in the alternative to convert this matter to an RPAPL 881 license case is denied and defendant's motion to dismiss is granted. The facts are not in dispute. Defendant owns/controls the building located at 30 Irving Place. Defendant was issued several Department of Buildings violations for issues relating to 30 Irving Place's exterior faXade. Defendant obtained permits to perform the corrections and were also issued permits to erect scaffolding, known as a sidewalk shed, in front of their building and in front of part of plaintiff's building. Plaintiff is the adjacent building to defendant. The photographic evidence and permit documents show that defendant's building is a twelve-floor building greater than 100 feet and plaintiff's building is five floors.
By stipulation, plaintiff discontinued against the Samco defendants.
--------
New York City Administrative Code 3307.6.2 and 3307.6.3 govern the requirements of sidewalk sheds. The regulation requires that the area to be protected shall extend the full width of the sidewalk, walkway, or pathway that remains open to the public and in cases where the sidewalk shed is installed to protect against an unenclosed faXade, work, or equipment that is greater than 100 feet (30 480 mm) above the ground, the shed shall protect the full length of the area specified in Section 3307.6.2 plus an additional 20 feet (6096 mm) on both sides beyond such length. The gap between the building and the shed is "not to exceed 1 inch (25 mm) along the face of the building or structure."
In compliance with the above statute, defendant erected a sidewalk shed in front of its building and for 20 feet in front of plaintiff's building. Defendant did not seek permission of plaintiff, nor seek a license pursuant to RPAPL 881 to erect the sidewalk shed in front of plaintiff's building. Plaintiff commenced this action by Order to Show cause and by filing a Complaint that sought a preliminary injunction pursuant to RPAPL 871 seeking the immediate removal of an encroaching structure. In addition, the Complaint alleged causes of action for trespass, conversion and nuisance. In the Order to Show Cause, plaintiff also sought that this matter be converted to a RPAPL 881 motion requiring defendant to pay a license fee. Defendant opposed and cross-moved seeking dismissal of the case.
A preliminary injunction is a drastic remedy, which should not be granted unless the movant demonstrates "a clear right" to such relief. ( City of New York v. 330 Continental, LLC, 60 A.D.3d 226, 873 N.Y.S.2d 9 [1st Dept.2009] ). The movant must establish: (1) a likelihood of success on the merits, (2) irreparable harm in the absence of an injunction, and (3) a balance of the equities in favor of the injunction ( Aetna Ins. Co. v. Capasso, 75 N.Y.2d 860, 552 N.Y.S.2d 918, 552 N.E.2d 166 [1990] ). Here, plaintiff is not entitled to a preliminary injunction. As discussed below, plaintiff does not meet the likelihood of success on the merits portion of the test. Similarly, the reason that defendant has placed the sidewalk shed is the requirement mandated by the New York City Administrative Code, which is based upon concerns for public safety. Since removal of the shed would result in a violation of the
Code and would constitute a threat to public safety, plaintiff cannot win on a balance of the equities.
As a threshold matter, as memorialized in plaintiff's supplemental papers, plaintiff withdrew the cause of action for conversion. Plaintiff's two remaining causes of action are for trespass and nuisance. The elements of a cause of action sounding in trespass are an intentional entry onto the land of another without justification or permission ( Marone v. Kally, 109 A.D.3d 880, 971 N.Y.S.2d 324 [2d Dept.2013] ; Carlson v. Zimmerman, 63 A.D.3d 772, 882 N.Y.S.2d 139 [2d Dept.2009] ). Here, it is undisputed that the reason for the alleged entry on to the land is that it is required by law and is for public safety. Both reasons provide a justification for the entry and do not give rise to trespass.
Further, the elements of a cause of action for private nuisance are: (1) an interference substantial in nature, (2) intentional in origin, (3) unreasonable in character, (4) with a person's property right to use and enjoy land, (5) caused by another's conduct in acting or failure to act ( Copart Indus., Inc. v. Consol. Edison Co. of New York, Inc., 41 N.Y.2d 564, 394 N.Y.S.2d 169, 362 N.E.2d 968 [1977] ; Chelsea 18 Partners, LP v. Sheck Yee Mak, 90 A.D.3d 38, 933 N.Y.S.2d 204 [1st Dept.2011] ). As discussed with respect to trespass, the fact that the sidewalk bridge is mandated by law and for public safety means that as a matter of law, the existence of the sidewalk bridge alone cannot be unreasonable and plaintiff cannot state a cause of action for private nuisance.
Generally speaking, a RPAPL 881 case is brought by a party seeking license and who has been unable to obtain one. However, under certain circumstances a Court may "convert" a case brought by the offended party to require the offending party to pay a license (see Mindel v. Phoenix Owners Corp., 210 A.D.2d 167, 620 N.Y.S.2d 359 [1st Dept.1994] ). RPAPL 881 provides:
When an owner or lessee seeks to make improvements or repairs to real property so situated that such improvements or repairs cannot be made by the owner or lessee without entering the premises of an adjoining owner or his lessee, and permission so to enter has been refused, the owner or lessee seeking to make such improvements or repairs may commence a special proceeding for a license so to enter pursuant to article four of the civil practice law and rules. The petition and affidavits, if any, shall state the facts making such entry necessary and the date or dates on which entry is sought.
Such license shall be granted by the court in an appropriate case upon such terms as justice requires. The licensee shall be liable to the adjoining owner or his lessee for actual damages occurring as a result of the entry.
Based upon the circumstances in this matter, the Court declines to "convert" this matter. Further, if the Court were to convert this matter, the Court would find that just terms require that no license fee be imposed. First, the Court finds that defendant has acted in good faith and has erected the sidewalk shed not because it simply wished to perform repairs, but because it was required to do so. The regulation that requires the sidewalk bridge, specifically requires that certain cutouts and provision for access be made. The regulation clearly made provision for the avoidance of interference and required the sidewalk shed to be extend 20 feet towards and within one inch of an adjacent building, without requiring any form of compensation. Further, in seeking the conversion, plaintiff has not specified any damages that it will suffer. The fact that the shed is built on the portion of the public sidewalk that is within plaintiff's property line is without consequence as that portion is traveled on by the public, utilized by the public and plaintiff has not claimed that it has lost any use of that area. Thus, plaintiff has no loss of enjoyment to its property.
To the extent that plaintiff argues that it's air rights are being violated, the Court finds that justice would also require that that no license fee be imposed. The photographic evidence of plaintiff's entire building and the portions of the building affected by the sidewalk shed show that no portion of the building has any object protruding and that the affected windows are unobstructed by the sidewalk bridge and still have air space for air conditioners. Thus, any claim of reduced light as a result of the presence of the sidewalk bridge are incidental to the legally required structure. To grant a license fee under these circumstances would be unjust.
To the extent that plaintiff urges this Court to view the Ponito matters as persuasive authority that a license should be granted (see Ponito Residence LLC v. 12th St. Apt. Corp., 38 Misc.3d 604, 959 N.Y.S.2d 376 [Sup.Ct.2012] and Ponito Residence LLC v. 12th St. Apt. Corp., Sup Ct N.Y. County, August 7, 2014, Mendez, J., index No. 156217/2014), the Court declines to extend Ponito to these facts. In the Ponito cases, the Court exercised its discretion to convert the matter to RPAPL 881 matter, after defendant had engaged in considerable delay in performing the work on its building and had still not proceeded with its construction work after 18 months in one action and due to the prior history of damage caused to plaintiff's garden in the other action. Here, the sidewalk shed had been put up just two months prior to the application and there is no indication of a history of damage. Accordingly, it is hereby
ORDERED, that plaintiff's motion for a preliminary injunction is denied, and it is further
ORDERED, that plaintiff's motion to convert this matter to an application under RPAPL 881 is denied; and it further
ORDERED, that defendant's motion to dismiss is granted, and this action is dismissed.