Section 85.26 - Leases and Easements; Rights-Of-Way for Electric Lines, Pipelines, Irrigation Canals, Etc(a) The board may execute leases and grant easements for rights-of-way for telephone, telegraph, electric transmission, and power lines, for oil pipelines, gas pipelines, sulphur pipelines, water pipelines and other electric lines and pipelines of any nature whatsoever, and for irrigation canals, and laterals, and may execute easements or leases for the erection and maintenance of electric substations, pumping stations, loading racks, tank farms, and other structures, and may execute easements for rights-of-way to the Texas Department of Transportation, to any county in the state, or to any corporation, group, organization, firm, or individual for highway or roadway purposes, on or across any lands belonging to the state and under the control of the board, if the board in its discretion deems it apparent that the interest of the state can best be served by the granting of the easements and leases.(b) Each easement granted under this section shall be on forms approved by the attorney general and shall include a complete description of the land on which the easement is to be granted, the period of time covered by the easement, the amount of money to be paid by the grantee to the grantor, or other consideration for the granting of such easement. It shall also specify the terms and conditions, penalties for failure to comply with its provisions, and other pertinent information necessary and desirable to effect a complete understanding of the transaction.(c) The grant of an easement for right-of-way, except an easement for right-of-way for highway or roadway purposes which may be for an indefinite term shall be limited to a term of not longer than 10 years, but any such easement may be renewed by the board.(d) All income received by the board under the provisions of this section shall be accounted for and used in the same manner as other money available to the part of the system to which the land from which the easement is granted is assigned.(e) No person, firm, group, organization, agency, or corporation shall hereafter construct any telephone, telegraph, transmission, or electric line, pipeline, electric substation, tank farm, loading rack, pumping station, irrigation canal or lateral, highway, or roadway of the kind and character enumerated in Subsection (a) of this section, across or on any section or part of a section of land of the character described in Subsection (a) of this section, who has not obtained a proper easement as provided by this section; or continue in possession of any such land without obtaining from the board a grant of a right-of-way easement or other easement across or on such land where the telephone, telegraph, transmission, or electric lines, pipelines, or any other transmission or pipelines, electric substation, tank farm, loading rack, or pumping station, irrigation canal or lateral, highway, or roadway is to constructed. Any person, firm, group, organization, agency, or corporation violating this subsection shall be liable for a penalty of $100 for each day of the violation, to be recovered by the attorney general.Amended by Acts 1995, 74th Leg., ch. 165, Sec. 22(31), eff. 9/1/1995. Acts 1971, 62nd Leg., p. 3194, ch. 1024, art. 1, Sec. 1, eff. 9/1/1971.