Wash. Rev. Code § 18.08.370

Current through 2024
Section 18.08.370 - Issuance of certificates of registration-Seal, use
(1) The director shall issue a certificate of registration to any applicant who has, to the satisfaction of the board, met all the requirements for registration upon payment of the registration fee as provided in this chapter. All certificates of registration shall show the full name of the registrant, have the registration number, and shall be signed by the chair of the board and by the director. The issuance of a certificate of registration by the director is prima facie evidence that the person named therein is entitled to all the rights and privileges of a registered architect.
(2) Each registrant shall obtain a seal of the design authorized by the board bearing the architect's name, registration number, the legend "Registered Architect," and the name of this state. All technical submissions prepared by an architect and filed with public authorities must be sealed and signed by the architect. It is unlawful to seal and sign a document after a registrant's certificate of registration or authorization has expired, been revoked, or is suspended.
(3) An architect may seal and sign technical submissions under the following conditions:
(a) An architect may seal and sign technical submissions that are: Prepared by the architect; prepared by the architect's regularly employed subordinates; prepared in part by an individual or firm under a direct subcontract with the architect; or prepared in collaboration with an architect who is licensed in a jurisdiction recognized by the board, provided there is a contractual agreement between the architects.
(b) An architect may seal and sign technical submissions based on prototypical documents provided: The architect obtains written permission from the architect who prepared or sealed the prototypical documents, and from the legal owner to adapt the prototypical documents; the architect thoroughly analyzes the prototypical documents, makes necessary revisions, and adds all required elements and design information, including the design services of engineering consultants, if warranted, so that the prototypical documents become suitable complete technical submissions, in compliance with applicable codes, regulations, and site-specific requirements.
(c) An architect who seals and signs the technical submissions under this subsection (3) is responsible to the same extent as if the technical submissions were prepared by the architect.

RCW 18.08.370

Amended by 2010 c 129, § 7, eff. 7/1/2011.
1985 c 37 § 8.

Effective date- 2010 c 129 s s 7-10: "Sections 7 through 10 of this act take effect July 1, 2011." [2010 c 129 s 11.]