(a) | Construction permit fee for a new campground.... | $600.00. |
(b) | Construction permit fee for an addition, alteration, or modification of an existing campground...................................... | $225.00. |
(i) | One to 25 sites................................. | $75.00. |
(ii) | Twenty-six to 50 sites.......................... | $100.00. |
(iii) | Fifty-one to 75 sites........................... | $125.00. |
(iv) | Seventy-six to 100 sites........................ | $150.00. |
(v) | One hundred one to 500 sites.................... | $225.00. |
(vi) | More than 500 sites............................. | $500.00. |
(d) | Late annual renewal license fee, after December 31..................................... | $100.00 |
(e) | License transfer fee............................ | $75.00. |
MCL 333.12506a