Current through P.L. 171-2024
Section 13-20-8-9 - Notification of criteria regarding contents(a) A generator that ships solid waste to a waste-to-energy facility must, before the facility accepts the solid waste, notify the facility if the solid waste meets any of the following criteria: (1) The solid waste contains: (C) a flammable material;(2) The solid waste: (A) was segregated from other solid waste; or(B) received special preparation for shipment.(3) The solid waste is a bulk material.(4) The solid waste is a waste resulting directly from a manufacturing process.(b) The notification under subsection (a) is required before each shipment by a generator of solid waste in bulk quantities to a waste-to-energy facility.As added by P.L. 218-2001, SEC.8.