Conn. Gen. Stat. § 16-NEW

Current with legislation from 2024 effective through July 1, 2024.
Section 16-NEW - [Newly enacted section not yet numbered] Solar feasibility assessment for schools seeking school building project applications
(a) Effective July 1, 2025, prior to submitting any application for a school building project pursuant to subsection (a) of section 10-283 of the general statutes, any local or regional board of education shall provide for a solar feasibility assessment for the school building that is the subject of such application, unless such school building already utilizes solar energy. The purpose of such solar feasibility assessment shall be to provide information to such local or regional board of education concerning the feasibility of installing solar photovoltaic systems on the premises of such school building. Such information shall include:
(1) The annual load at the electric meters for such school building during the most recent calendar year, if applicable;
(2) the area of rooftop space and impervious surface on the premises of such school building that is available to host solar photovoltaic systems;
(3) available opportunities for interconnection with the electric distribution system; and
(4) a description of anticipated costs, savings and contractual terms for any such solar photovoltaic systems, including interconnection costs and electric bill credits.
(b) Such local or regional board of education may provide for such a solar feasibility assessment pursuant to subsection (a) of this section in coordination with other local or regional boards of education.

Conn. Gen. Stat. § 16-NEW

Added by P.A. 24-0151,S. 176 of the Connecticut Acts of the 2024 Regular Session, eff. 7/1/2024.