There shall be no dredging beyond the bulkhead line for the sole purpose of providing fill for upland or submerged land within the bulkhead line. In addition there shall be no drilling of wells, excavation for shell or minerals, and no erection of structures (other than docks) within the preserve, unless such activity is associated with activity authorized by this section.
Fla. Stat. § 258.396
Former s. 258.16.