Section 5-8 - Stock Pits

a. Stock pits are considered as stock reservoirs; therefore, the wording throughout the application should not be altered to read "stock pits." When the structure is a stock pit, the application is prepared in the same manner as for any other stock reservoir, with the following exceptions:

  • (1) The Area Hap should show the top dimensions, bottom dimensions, depth, capacity computations, and surface area computations. The formula used to compute capacity and area is shown on page 69.
  • (2) The Profile of Damsite should be changed to Section A-A of the pit. Show a complete profile of the pit, including the high-water line elevation at top of ground, and the bottom elevation. The Section A-A of the pit should also include the horizontal scale, vertical elevation scale, and stationing.

b. An example for the proper method of preparing the second page of the application form for a pit type stock reservoir, is shown on page 69.

Image Not Available

Image Not Available

Image Not Available

Image Not Available

Image Not Available

037-5 Wyo. Code R. § 5-8